Migrating Server to new controller
- From: "Nathaniel" <fake@xxxxxxxx>
- Date: Tue, 14 Apr 2009 08:46:29 -0400
With ntbackup out the window in Windows 2008 how can I install a new
controller without hosing the system? I'm going from a LSI SAS controller to
a 3ware SAS controller.
I'm doing full nightly backups with system states to a USB enclosure.
I'm thinking about this procedure now:
1. Install 3ware with drivers and application.
2. Reboot the server and run a full backup.
3. Shutdown the server and attach disks
4. Build three new disk arrays (C: RAID1 2x73GB), (D: RAID1 2x73GB) (E:
RAID10 4x146GB) and align the disks.
5. Boot off of Setup DVD and run a restore from that last backup done that
night.
6. ???
7. Profit.
Any other procedure that would reduce my setup time or actually work?
.
- Prev by Date: Re: HP Proliant ML110 G5 Server issue
- Next by Date: Re: what's the deal on firewall in SBS 2003 standard?
- Previous by thread: Re: Unable to establish the VPN connection. (Error 800) in SBS 2003
- Next by thread: Enable Sharepoint 2007's UNC folder path
- Index(es):
Relevant Pages
|