From Eval Version to Official W2K3
From: Robert Paulson (anonymous_at_discussions.microsoft.com)
Date: 04/01/04
- Next message: Brian: "I need a real brain to help!!"
- Previous message: Gus: "Re: 2 Primary controller in one Network"
- Messages sorted by: [ date ] [ thread ]
Date: Thu, 1 Apr 2004 14:01:34 -0800
Hello I was wondering if I can setup a server system with
the eval version promote to DC then before then if
testing works well export the NTLDR Active directory
files and copy them onto a purchased copy of W2K3. . . If
not how can this be acomplished, I would like to make the
jump a smooth as possible saving as much Configuration
data as possible including the AD. Thanx
- Next message: Brian: "I need a real brain to help!!"
- Previous message: Gus: "Re: 2 Primary controller in one Network"
- Messages sorted by: [ date ] [ thread ]
Relevant Pages
|