Re: Copying a sourcesafe project with history
- From: "Mark Tolonen" <mark.e.tolonen@xxxxxxxxxxxxxx>
- Date: Tue, 25 Mar 2008 17:41:25 -0700
"jeeji" <jihad_dk@xxxxxxxxx> wrote in message news:cbb9e5d9-5e5a-4ac6-b4c9-eaefed3674cc@xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Hi
I would like to know if the only/easiest way to copy a sourcesafe
project including its history is to Share and Branch?
I am talking about a copy within the same database.
What bothers me with the fact that I can do it using a Share/Branch is
that I have the feeling (I am not sure) that they still are connected
somehow, which I do not want them to be.
So my other question is are they connected, and what consequences can
that possibly have?
As long as you check "branch after share", all the files will be a new copy branched from the old.
--Mark
.
- Follow-Ups:
- Re: Copying a sourcesafe project with history
- From: jeeji
- Re: Copying a sourcesafe project with history
- References:
- Copying a sourcesafe project with history
- From: jeeji
- Copying a sourcesafe project with history
- Prev by Date: RE: VS2008Pro - Install Failure
- Next by Date: Re: Branches the same file into 3 different branches
- Previous by thread: Copying a sourcesafe project with history
- Next by thread: Re: Copying a sourcesafe project with history
- Index(es):
Relevant Pages
|