How do I document the paths from a Decision in an activity diagram?
From: Jason (nfr_at_nospam.com)
Date: 08/23/04
- Previous message: Ben Lucas: "Re: Reverse Engineer UML from VS.NET 2003 Enterprise Architect generates empty Visio documents"
- Messages sorted by: [ date ] [ thread ]
Date: Mon, 23 Aug 2004 10:37:57 -0700
This seems as though it should be basic, but I am unable to show the control
options coming out of a Activity Decision. For example, if I am checking for
a valid uid/pw, the flow goes one way if the user enteris invalid
credentials and another if the login attempt is valid... however, all I can
get are two unlabled controls out of the decision icon.
This seems as though it should be rather simple, but for the life of me I
can't figure it out. For example, "Name" is grayed out in the control flow
"Shape Display Options", etc.
- Previous message: Ben Lucas: "Re: Reverse Engineer UML from VS.NET 2003 Enterprise Architect generates empty Visio documents"
- Messages sorted by: [ date ] [ thread ]