Re: Crystal Enterprise 9.0 Scheduling

Tech-Archive recommends: Repair Windows Errors & Optimize Windows Performance

From: Bob Holmes (rholmes_at_REMOVEmmwec.org)
Date: 03/03/04


Date: Wed, 3 Mar 2004 07:54:00 -0500

Hi Gerry,
    I can't answer all of your questions, but I'll try to help. We use CE9
with all of the components installed on one machine, but I only have a few
that are scheduled to be processed routinely. We have manually scheduled
the report to run at the desired time on a specific interval. Most of my
reports take only seconds to process, so I would think that all of my
reports could be scheduled successfully over night. This all depends on the
complexity of your reports. I'm not sure what the best way to do this for
so many report would be. I would think that there is programmatic way of
calling the reports, one at a time, for scheduling. I'd be interested in
this answer myself. I don't know what that "Apos Excel" thing is, sorry.

Bob Holmes

"Gerry Dauphin" <gerryd@maine.rr.com> wrote in message
news:K791c.55948$um1.42017@twister.nyroc.rr.com...
> Hi all,
> I'm concerned about scheduling (creating a .pdf on a network drive)
hundreds
> of reports to run the same night on 1 machine. Could anyone provide any
> insight on a good way to handle scheduling a lot of reports? Can a fast
> machine handle a lot or should I not bother trying and just get more
> machines. Also, does this stuff really work? Do you recommend the Apos
Excel
> thing? Sorry for all the questions but I'd appreciate any advice.
> Thanks,
> -Gerry
>
>



Relevant Pages