Re: Jobs not running manually or scheduled
- From: "phoenix.yk" <phoenix.yk@xxxxxxxxx>
- Date: 3 May 2006 15:04:17 -0700
Is your SQL Server Agent running? If not, you should run it first for
the sheduled job.
I think that why the Next Run Date column says "(Date and Time are not
unavailable)".
Thanks,
Atkins wrote:
I'm assisting someone who started having trouble with most of their
scheduled SQL jobs not running after they moved their server to a new
location/plant. As a side note, my understanding is the servers belong
to their own domain so this move should not have affected things too
much.
Furthermore, the Jobs do not seem to run when you right click and
choose start job. There is no indication of success or failure The
Next Run Date column says "(Date and Time are not unavailable)" and
Last Run Status column says "Unknown". "View Job History..." says
"There is no history information for this job".
I have created a new Test job with one step and one line containing a
print statement. On the Step's Advanced tab I set it to output to a
file. However, again there is no sign that the step was executed.
Because the file was not created and the Job status and history still
displays the same messages. I should also mention that this was using
the same owner as the other jobs that are working and that the owners
I've tried are sysadmins. One is a windows account and the other is a
SQL Account. The jobs that are working are using the SQL Account.
The Server is SQL Server 2000 RTM (no Service packs installed) on
Windows 2000 Standard w/ SP3
Thanks for any help!
.
- Follow-Ups:
- Re: Jobs not running manually or scheduled
- From: Atkins
- Re: Jobs not running manually or scheduled
- Prev by Date: Re: Jobs not running manually or scheduled
- Next by Date: Re: Jobs not running manually or scheduled
- Previous by thread: Re: Jobs not running manually or scheduled
- Next by thread: Re: Jobs not running manually or scheduled
- Index(es):
Relevant Pages
|