Re: Optimization Failure in a Maintenance Plan
- From: Fogster <colinehill@xxxxxxxxxxx>
- Date: Thu, 13 Mar 2008 08:42:03 -0700 (PDT)
On Mar 10, 8:30 pm, "Tibor Karaszi"
<tibor_please.no.email_kara...@xxxxxxxxxxxxxxxxxx> wrote:
Specify for the plan to create a report file and check that file for error messages. "Failed"
doesn't give us much to go on. :-)
--
Tibor Karaszi, SQL Server MVPhttp://www.karaszi.com/sqlserver/default.asphttp://sqlblog.com/blogs/tibor_karaszi
"Fogster" <colineh...@xxxxxxxxxxx> wrote in message
news:9d86c84d-1c30-4554-9777-38b3c213184c@xxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Hi,
We are getting a failure on a Optimization Job for a DB Maintenance
Plan.
The event log states a 208 error with the Job Engine.
The Job History is:
The job failed. The Job was invoked by Schedule 88 (Schedule 1). The
last step to run was step 1 (Step 1).
Any ideas or pointers?
thanks in advance- Hide quoted text -
- Show quoted text -
Hi,
Finally got to look at the server again and the error in the log
is......
[Microsoft SQL-DMO (ODBC SQLState: 01000)] Error 0: This server has
been disconnected. You must reconnect to perform this operation.
.
- Follow-Ups:
- Re: Optimization Failure in a Maintenance Plan
- From: Tibor Karaszi
- Re: Optimization Failure in a Maintenance Plan
- References:
- Optimization Failure in a Maintenance Plan
- From: Fogster
- Optimization Failure in a Maintenance Plan
- Prev by Date: Re: How to run a DB shrink
- Next by Date: Re: Optimization Failure in a Maintenance Plan
- Previous by thread: Optimization Failure in a Maintenance Plan
- Next by thread: Re: Optimization Failure in a Maintenance Plan
- Index(es):
Relevant Pages
|