From: Sully (suleiman_at_cite.co.uk)
Date: 05/21/04


Date: Fri, 21 May 2004 02:43:59 -0700

Hi

I have installed Project Server central on my IIS5
machine and evertime I try to login I get the following
error:
Server object error 'ASP 0178 : 80070005'

Server.CreateObject Access Error

/ProjectCentral/Library/LocalizedStrings.asp, line 18

The call to Server.CreateObject failed while checking
permissions. Access is denied to this object.

I have checked the permissions which are are set to :
Everyone - Full Control but it doesn't seem to make a
difference.

At code level, Line 18 - is as follows:
this.oTextConv = Server.CreateObject('TextConv.TextConv');

I searched for this and found a folder called TextConve
and the permissions are set to Everyone - FC. What does
this com do and how do I solve this problem!

Sully



Relevant Pages

  • [SLE] Problem ripping CD
    ... CDROM read or access error. ... I have checked the permissions, the drive works (I installed SuSE 9.3 ... When installling 9.3 I performed ...
    (SuSE)
  • Re: Anonymous Access Fails with IIS 5.1 and Windows XP Pro
    ... trace the access error. ... I am running XP Pro with IIS 5.1 with the folliwing settings: ... List Folder Contents ... I still have the login screen... ...
    (microsoft.public.inetserver.iis.security)
  • asp permission error
    ... I was fortunate enough to find aspfaq.com and found the ... Joe ... >Server.CreateObject Access Error ... >Can anyone direct me how to set the permissions here? ...
    (microsoft.public.inetserver.asp.general)
  • Re: SMS Report error, Please help!
    ... Server.CreateObject Access Error ... The call to Server.CreateObject failed while checking permissions. ... permission on SMS_Reporting_point via dcomcnfig.exe but still doesnt work. ... Prev by Date: ...
    (microsoft.public.sms.admin)