Re: Project 2007 - Error Messages When Saving Files

Tech-Archive recommends: Repair Windows Errors & Optimize Windows Performance



Hi Jim,

Are you seeing the 'unexpected error' as Nitaw says when you update
a task or the 'unexpected error' Rowie says when saving? Are you
saving to a network drive? Is it possible that the connection to
the network has been interrupted?

Julie

"jballred" <jballred.401ybb@xxxxxxxxxxxxx> wrote in message
news:jballred.401ybb@xxxxxxxxxxxxxxxx

I will repost your suggestion to the Server list. However, we've
seen
this problem on and off over the past 2 to 3 years but we've only
been
using server for the past year. I really do suspect that this is
more a
problem with MS Project Desktop than with Server.

The problem really is difficult to characterize as it has not been
repeatable.

Thank You,
Jim


--
jballred
------------------------------------------------------------------------
jballred's Profile: http://forums.techarena.in/members/144006.htm
View this thread:
http://forums.techarena.in/microsoft-project/1098237.htm

http://forums.techarena.in



.



Relevant Pages

  • RE: Word 2003 hangs on save to Network
    ... See if any application is crashing, if yes, then uninstall/fix that and then try saving ... If webdav requests succeeds Word hangs, if it fails word doesn't hangs. ... Word 2003 hangs on save to Network ... Server was originally a win 2k server all work stations where upgraded ...
    (microsoft.public.word.docmanagement)
  • Re: saving Word document to os x server
    ... Since this is the first I've heard of problems with Word 2004 saving ... previous *can't* save to server problems (with Word X ... >> Entourage Help Page: ... >>> change, then save it, it takes forever to save the document (by forever ...
    (microsoft.public.mac.office.word)
  • Re: saving Word document to os x server
    ... Since this is the first I've heard of problems with Word 2004 saving ... previous *can't* save to server problems (with Word X ... >> Entourage Help Page: ... >>> change, then save it, it takes forever to save the document (by forever ...
    (microsoft.public.mac.office)
  • Re: PATCH: mouse and keyboard by default if not embedded
    ... The 2.5 kernel I just compiled is currently about three times larger than the ... So if we're saving 10-30k (not just ... 0.003% of ram on a server setup. ... send the line "unsubscribe linux-kernel" in ...
    (Linux-Kernel)
  • Re: Urgent performance win2000 server with QuickBook
    ... I don't know about an exact solution but with a little digging it might be possible to help. ... windows 2000 server installed in my computer P4 3.0 GHZ ... working great and saving the quickbook files very quickly ...
    (microsoft.public.win2000.general)