Hi Rob,

Sorry but I don't quite follow. If I buy a product that does not deliver,
then does not the manufacturer have an obligation to fix? I realsie that now
there is project 2007, but that does not detract from the fact that the
original product does not work as designed and expected. If you buy a car
and the electronic ignition does not work properly but the new model does not
have this failign, is the answer now for the manufacturer to simply say
"sorry buy the latest car"?

Sorry but that argument does not work under most consumer legislatio nor any
prudent and responsible manufacturer.

Regards

DavidC

"Rob Schneider" wrote:

Naw. I don't anticipate that Microsoft will fix this; nor do I
anticipate that the people/org who "locked" you into Project 2003 will
fix either. On the contrary I *expect* them to since they withhold from
me the ability to fix on my own.

DavidC wrote:
Hi Rob,

Understand what you are saying. My guess is that in your part of the world
Microsoft are more customer friendly. My experience and I believe that of
our service people, is that Microsoft have a neat little filtering system
that places all the problems at the feet of the user or want to charge over
$300 for them to research out the problem.

Hence certainly my experience with Microsoft is one that says 'don't bother'
and we have to put up with yet again a faulty piece of microsoft software.

I was hoping that someone else may have found the same problem and knew of a
fix. It was a long shot, which I guess isn't paying off.

Thanks anyway

Regards

DavidC

"Rob Schneider" wrote:

I know this is cheeky, but if a group in your company takes on the
responsiblity to "rollout" a standard version, then they take on the
responsibility to fix it. They surely have better connections to
Microsoft than this forum has.

DavidC wrote:
No.

I need to work in 2003 as that is the 'rolled out' version at work. I only
have 2007 version so that I can convert schedules from a couple of
contractors who submit them in 2007 version. Yes we can ask for them to
convert, but reality is that it is quicker for me to convert so I can keep up
to date as soon as possible and not waste time going back and forth to get
the conversion done.

DavidC

"Rob Schneider" wrote:

Is the solution to rely on 2007 rather than make 2003 work (which
appears not possible)?

DavidC wrote:
For my part, the print preview does not show the A1 size at all. all that I
get is about 3 vertical bands of white with nothing showing. I then take a
punt and print it anyway and that is when I find the last two boxes are
missing the details.

As I mention, it only happens on the 2003 version. The same file opened in
2007 shows properly in print preview and prints out correctly.

Regards

DavidC

"Mike Glen" wrote:

Does the Print Preview using A1 or A0 look right before printing? What is
the position if you don't use PDF?


Mike Glen
Project MVP
See http://tinyurl.com/2xbhc for my free Project Tutorials


"Dytham" <Dytham@xxxxxxxxxxxxxxxxxxxxxxxxx> wrote in message
news:DB11621E-4A8A-4B31-8B30-B05E20C8A0E4@xxxxxxxxxxxxxxxx
Hi David;

I have just tried this on my version of Project 2003 SP3 with similar
problems to yours.

Network diagram, PDF print preview to A3 is fine, but with A1 size, last
half dozen boxes on each page are empty. It is even worse at A0 size.

I'm not even using Adobe, but PDF reDirect.

As you say, it does point to being a Project issue.

Rgds,
Chas.

.



Relevant Pages

  • Re: [Full-disclosure] Office 0day
    ... more and continue consulting for microsoft rather than criminal networks. ... to fix the product if it is flawed. ... That is like me trying to argue that after going to a car mechanic, ... "Members of the jury, by keeping quiet about the bug and not shipping a patch, ...
    (Full-Disclosure)
  • Re: Printing to A1
    ... they have approached Microsoft. ... Tell the IT people to get Microsoft to fix it. ... I just don't anticipate that they will and therefore we ... is the answer now for the manufacturer to simply say ...
    (microsoft.public.project)
  • Re: Cant print in Word X for Mac
    ... Other kinds of printer and other kinds of printer drivers are working ... I guess we can hope that Apple might put out a patch to fix this. ... We must assume that Microsoft won't do anything for Office X: ... I could not use the OS X built-in Save As PDF function either. ...
    (microsoft.public.mac.office.word)
  • Re: spooler not starting
    ... If it still fails to run then maybe the hotfix is ... in that case you will have to call Microsoft for the fix. ... Lexmark tech support to download and install the fix. ...
    (microsoft.public.windowsxp.help_and_support)
  • Re: Microsoft, please, a solution for the STB!!!!!!!
    ... Your statements of impact will be where I push for a fix but I ... and have had no response from Microsoft or from anyone that might be ... MCE 2005 really is an excellent product so far and i would love to ... learn/repeat these codes? ...
    (microsoft.public.windows.mediacenter)