Re: A circular reference exists - Error

Tech-Archive recommends: Repair Windows Errors & Optimize Windows Performance



Hi,

So, you have both SP-1 and the Infrastructure Update installed to
Project 2007? Again, I cannot reproduce and as it occurs with all
files, I have to assume there is something amiss with the
installation. Although I hate to recommend a re-install, if you are
confident that the installations are up to date, I suggest trying an
uninstall and reinstall. Perhaps if you could try a fresh install
on a test machine and try to reproduce the error that might help.

Julie

"binaryboyz" <binaryboyz@xxxxxxxxxxxxxxxxxxxxxxxxx> wrote in message
news:5EC7F864-055C-4E5A-A567-5CE334A54ECE@xxxxxxxxxxxxxxxx
Hi JulieS,

This problem occur with all files. Updates are okay. Is there any
important
update that I need to check.
I found one KB article: http://support.microsoft.com/kb/169729, i
did not
try but i dont know whether it is useful or not.


binaryboyz


"JulieS" wrote:

Hello binaryboyz,

I cannot reproduce what you report. I suggest double checking
the
service packs installed to both Project 2007 and Project 2003.
Project 2007 is up to SP-1 as well as an Infrastructure Update
released in July 2008.

The circular reference needs to be resolved in your project file.
Check for links on summary tasks.

Does the problem occur only with one file or all files?

I hope this helps. Let us know how you get along.

Julie
Project MVP

Visit http://project.mvps.org/ for the FAQs and additional
information about Microsoft Project

"binaryboyz" <binaryboyz@xxxxxxxxxxxxxxxxxxxxxxxxx> wrote in
message
news:E9A55A82-58FE-4C40-B732-D883ADED56EC@xxxxxxxxxxxxxxxx
When a file is created with Project 2007 and the file is saved
down to the
2003 file format there is an issue with the file becoming
corrupted no matter
which version of the application opens the file and saves the
changes.

The following issues occur:
- Upon opening the file the error "A circular reference exists"
- After opening the file tasks the missing (blank spaces) or
the
sequence of
the tasks has been changed.

Thanks





.



Relevant Pages

  • Re: A circular reference exists - Error
    ... The behavior of MS Project 2007 is not consistent. ... installation. ... Project 2007 is up to SP-1 as well as an Infrastructure Update ... The circular reference needs to be resolved in your project file. ...
    (microsoft.public.project)
  • Re: A circular reference exists - Error
    ... how do I check Infrastructure update for Project 2007? ... "JulieS" wrote: ... installation. ...
    (microsoft.public.project)
  • Re: A circular reference exists - Error
    ... Are you up to date on the service pack and infrastructure update for ... The behavior of MS Project 2007 is not consistent. ... you have both SP-1 and the Infrastructure Update installed to ... installation. ...
    (microsoft.public.project)
  • Re: How to be a Biztalk Expert -- Misadventures?
    ... Larry Franks ... | What part of SQL Server adapter Receive Location is broken? ... |>| The first one we assumed that it was an installation issue. ... what were the steps you took to reproduce these issues? ...
    (microsoft.public.biztalk.general)
  • Re: A circular reference exists - Error
    ... Service pack is okay, how do I check Infrastructure update for ... installation. ... on a test machine and try to reproduce the error that might ... Updates are okay. ...
    (microsoft.public.project)