RE: MS-Project Server 2007: open a server file
Tech Tip: Click here to run a free scan for Windows Errors and optimize PC performance
I solved the problem. The solution has been described already somewhere else.
The trick is to use <>\ in front of the filename and not using a mpp suffix
"KingProject" wrote:
I am able to open files, which are stored on local drive by
WinProj /s <servername> filename
It fails, if the file is only stored on the server. I got an error "Project
cannot open File".
I saw a post using server.mdb\filename instead of only using the filename.
I assume it means that by accessing the server a local copy of the database
file is written in a temp directory on the local drive.
My problem is: I can't see this mdb.
How does it work with MS-Project server 2007?
.
Relevant Pages
- Re: fetch extension - use local filename from content-dispositionheader (new diff)
... Previously giving this non-argument -O flag would use the ... Now this flag takes an expected filename as an argument. ... if we make a mistake in the URL or if the server changes the mapping. ... +If the server sent a Content-Disposition header, the +.Fa content_disposition +field will contain the suggested local filename. ... (freebsd-current) - Re: Testing a file-type input element
... the filename selected is, or whether one was selected at all. ... may arise when the user inadvertently submits the form without selecting all ... I can test for an empty file form element name at the server side script, ... As far as client-side security goes: ... (comp.infosystems.www.authoring.html) - Re: Need help to reanimate an AT&T AT&T 3B1/7300 UNIX-PC
... mad at the user for creating filenames like that on a unix file server. ... pass a filename with '/' in it without attempting to interpret whatever ... at a lower level that the rest of the OS -- which since Microsoft's ... and let the install scripts work from there. ... (comp.sys.3b1) - Re: Unable to verify copied file
... > file from a server for which the actual filename will vary when copied ... and there's only ever one of these files on the server share. ... it is my understanding that you can't verify ... -- torgeir, Microsoft MVP Scripting and WMI, Porsgrunn Norway Administration scripting examples and an ONLINE version of the 1328 page Scripting Guide: ... (microsoft.public.scripting.vbscript) - Re: Messaging alert
... a file name and other information thru the client socket to then process ... You only need 1 server. ... append fbuffer($sock) ... # You also need a protocol to transfer the filename. ... (comp.lang.tcl) |
|