SP3 not installed and am getting it installed. I'll try again and for your
info I'll let you know if this does the trick. Thanks
"JulieS" wrote:
Hello Rwturen01,.
Have you installed SP-3 for Project 2003? With SP-3 installed, I have
no trouble saving as HTML. It's possible that a recent security
update has changed your ability to save as HTML.
I hope this helps. Let us know how you get along.
Julie
Project MVP
Visit http://project.mvps.org/ for the FAQs and additional information
about Microsoft Project
"Rwturen01" <Rwturen01@xxxxxxxxxxxxxxxxxxxxxxxxx> wrote in message
news:7B89AC6D-1629-456F-A5C9-6CF2F7B3F90E@xxxxxxxxxxxxxxxx
Very odd indeed. Last week I was able to do it and this week I am
fainling
with the exact same error. In fact, I've tried a number of things,
(different name, different target folder, different extensions) I
can't save
in any format other than mpp.
I'm now also looking for assistance on what to try next.
"chief123" wrote:
When trying to save a Project as a web page using the export
wizard, it gets
down to the point where it will try to create the HTML page and
then we get a
Operation Failed. Any ideas on what to try?
Thanks.
- References:
- Project 2003 SP2. Operation failed saving as HTML
- From: chief123
- RE: Project 2003 SP2. Operation failed saving as HTML
- From: Rwturen01
- Re: Project 2003 SP2. Operation failed saving as HTML
- From: JulieS
- Project 2003 SP2. Operation failed saving as HTML
- Prev by Date: Re: external task
- Next by Date: Re: BCWP and BCWS
- Previous by thread: Re: Project 2003 SP2. Operation failed saving as HTML
- Next by thread: Re: Project 2003 SP2. Operation failed saving as HTML
- Index(es):
Relevant Pages
|