Resource Allocation
I have to allocate a resource which is different that the normal ones.
Slab forms - This is a set of forms which:
1. Required 3 days for installation
2. Beyond these 3 days, other activities like reinf binding & casting
needs to be done
3. After the casting activity, the concrete cast needs to attain
strength - 7 days after casting
4. Then these forms can be dismanatelled and reused
I need to allocate resource for this - say a set of 1500 sqm.
How do i do this by having a single task
.
Relevant Pages
- Re: [lm-sensors] Could the k8temp driver be interfering with ACPI?
... But there is also a performance penalty for legitimate I/O access, ... I thought Rudolf's patch allocated the resource in the driver ... Since ACPI never *really* wants to allocate the ... In fact Rudolf's solution is nice for LPC chips, ... (Linux-Kernel) - Re: Work scedule for individual workers? MS Project 2007
... I have a construction project and I would like to allocate ... I have 3 x labourers, Bill, Ed, and Will. ... 100% to indicate multiple of a skill set or resource. ... named workers under a skillset and ask MS Project to allocate them ... (microsoft.public.project) - Re: NdisQueryBufferSafe question
... Yes it is normal to have a chained buffer of length zero. ... If the call fails, the worst that can happen is ... failure to allocate resources could be far more devastating. ... Don't bother with queuing because that could make the low resource situation ... (microsoft.public.development.device.drivers) - Re: HPET regression in 2.6.26 versus 2.6.25 -- connection between HPET and lockups found
... Does this connection between HPET and insert_resourcelook ... perhaps we stomp over some piece of memory that is "available RAM" ... this will allocate the hpet resource descriptor in lower RAM. ... (Linux-Kernel) - [patch 2.6.13-rc2] yet another fix for setup-bus.c/x86 merge
... x86 PCI setup wrt which recourses are invalid vs resources that are ... Precisely, in the setup-bus.c, if we failed to allocate some resource, ... send the line "unsubscribe linux-kernel" in ... (Linux-Kernel) |
|