Re: why is screen blank?

Tech Tip: Click here to run a free scan for Windows Errors and optimize PC performance



Hi Rob,

I don't know if this is the cause of your problems, but see the
following Knowledge Base article for a possible "fix":

http://support.microsoft.com/kb/891170/en-us

I hope this helps. Let us know how you get along.

Julie
Project MVP

Visit http://project.mvps.org/ for the FAQs and additional information
about Microsoft Project


"Rob from Peoria" <RobfromPeoria@xxxxxxxxxxxxxxxxxxxxxxxxx> wrote in
message news:065BFB06-D3FB-43E1-A686-503741768691@xxxxxxxxxxxxxxxx
Well the help guy came back and we tried uninstalling, rebooting,
installing,
repairing and resetting defaults from the help menu. No effect. It
still
remembered the files history somehow, so it didn't delete everything.
Maybe there is a shared file in the MS Office directory that is
corrupted.
We may try uninstalling the MS Office components and reinstalling
tomorrow
unless anyone has a better idea.


"Rob from Peoria" wrote:

Thought I'd post this here. The help desk here can't figure it out.
MS
Project2003- was working fine a few days ago. I loaded my project
and
nothing is there. Same for any other project I load. No menu
options.
Can't create a new project. Can't create tasks. Nothing shows at
all. Only
thing I did between last use was install some other software and
uninstall
reinstall (not MS software).


.



Relevant Pages

  • Re: Word 2000 wont start
    ... reinstalling my printer allowing the Plug and Play feature guide me through ... printer driver is incompatible with your older version of Word, ... Startup folder which are loaded when Word is launched. ... had no normal.dot file on my machine even after uninstalling and ...
    (microsoft.public.word.application.errors)
  • Re: Corrupted templates
    ... Removing and reinstalling is unlikely to resolve the problem because there ... is so much that isn't removed by uninstalling (all the users ... If this is happening in Safe Mode, then it is very curious though. ... document based on normal.dot or a pre-formatted template. ...
    (microsoft.public.word.application.errors)
  • Re: Mailto: link causes IE 6 to crash
    ... I can use this workaround to get done what i need to get done, ... I ran two registry checker/cleaner programs yesterday. ... I have tried uninstalling and reinstalling IE and OE. ...
    (microsoft.public.windows.inetexplorer.ie6.browser)
  • Re: "Operation canceled due to restrictions"
    ... Would uninstalling and reinstalling Outlook have any ... I'd simply first try uninstalling Office 2003 and reinstalling it. ... If that brings no joy, then try using Startup Repair or the bootrec commands and see if those measures fix this: ...
    (microsoft.public.windows.vista.general)
  • Re: Office 2007 SP1 update error, Ive tried eveything...
    ... people in the MS forums and other tech forums and NONE of them have helped. ... Installing the patch referenced in KB946691 - failed ... Uninstalling Office 2007 from the control panel and reinstalling Office ...
    (microsoft.public.officeupdate)