Yes, we're all co-mingled.
Do you have a URL for the newer technology release, I've been searching
since my last post ....

"JulieS" wrote:

Hi Jim,

Keep us posted. I haven't seen any other comments on the feedback for
Project 2007 website about the error, but it could be no one has posted
it yet.

Just a quick question, is Project 2007 installed on the same machine as
2003? It may be that 2007 "broke" 2003 if they are installed on the
same OS.

Julie

Visit http://project.mvps.org/ for the FAQs and additional information
about Microsoft Project


"Jim Aksel" <JimAksel@xxxxxxxxxxxxxxxxxxxxxxxxx> wrote in message
news:42F5F9B2-9BE6-4949-856D-73ACE151217D@xxxxxxxxxxxxxxxx
Yes, my problem is pretty much how you describe it. P2007 (File/Save
As...)
in 2000-2003 format. The file in 2000-2003 format opens fine in 2007
but
cannot be opened in 2003. I see from your comment that you have been
successful in this endeavor.

I tried it with a second file, same results. I'll try the new version
of
2007 and see if that helps.

"JulieS" wrote:

Hi Jim,

I'm not sure I follow what you have done. Specifically your comment
about the "exported file."

In Project 2007 Beta 2 there is an option to save a Project 2007 as
2000-2003 Project format.

I have been able to save a file created in Project 2007 as a
2000-2003
format and open it without difficulty in Project 2003. I have also
been
able to open a project file created in Project 2003 in Project 2007
work
on it, save it as 2000-2003 format and re-open in Project 2003.

I am using Project 2003 Professional (SP-2) and Project 2007 Beta2
with
the Technical Refresh that was released recently. However, my Project
2007 install is to a Virtual PC on the same computer, so I am not
running the two different versions under the same operating system --
each is installed in its own version of Windows XP.

I hope this helps. Let us know how you get along.

Julie

Visit http://project.mvps.org/ for the FAQs and additional
information
about Microsoft Project


"Jim Aksel" <JimAksel@xxxxxxxxxxxxxxxxxxxxxxxxx> wrote in message
news:43FCEA16-5B68-4745-B407-0E7585E9822D@xxxxxxxxxxxxxxxx
I am attempting to save a file from 2007 format back to 2000-2003
format.
When I go to open the exported file using Project Standard 2003, I
receive a
message that I must download a converter. There does not appear to
be
a
2007-2003 coverter on the resultant page that opens.

If I try to continue the process, I get an error message and
Project
restarts to Project 2007.

Any suggestions? I need to distribute this file to 2003 users.
Are
others
having "downgraded version" problems?

Thanks
Jim






.



Relevant Pages

  • Re: Removing password-protected
    ... by saving it as you said to the 2000-2003 format .mpp, however, a ... "JulieS" wrote: ... I've stepped through creating and removing passwords in MS ...
    (microsoft.public.project)
  • Re: Downconvert file from 2007 Beta to 2003
    ... Technical Refresh install. ... Save as 2003 format in new file name. ... 2007-2003 coverter on the resultant page that opens. ...
    (microsoft.public.project)
  • Re: Downconvert file from 2007 Beta to 2003
    ... format and open it without difficulty in Project 2003. ... 2007 install is to a Virtual PC on the same computer, ... 2007-2003 coverter on the resultant page that opens. ... If I try to continue the process, I get an error message and ...
    (microsoft.public.project)
  • Re: Downconvert file from 2007 Beta to 2003
    ... "JulieS" wrote: ... format and open it without difficulty in Project 2003. ... 2007 install is to a Virtual PC on the same computer, ... 2007-2003 coverter on the resultant page that opens. ...
    (microsoft.public.project)
  • Re: Downconvert file from 2007 Beta to 2003
    ... The 2003 format file will not open with either P2007 or P2003. ... 2007 install is to a Virtual PC on the same computer, ... 2007-2003 coverter on the resultant page that opens. ... If I try to continue the process, I get an error message and ...
    (microsoft.public.project)