Re: Why is Visio interfering with Project over voice recognition?

Tech Tip: Click here to run a free scan for Windows Errors and optimize PC performance



Hi llw,

I've run into this before at a client site. The only thing I could do
was remove the option. Control Panel > Regional and Language Options.
Click the Languages tab. Click the Detail button. That should open the
Text Services and Input Languages dialog box. On the settings tab under
installed services remove the items for Voice recognition.

I hope this helps. Let us know how you get along.

Julie

"llwilcox" <llwilcox@xxxxxxxxxxxxxxxxxxxxxxxxx> wrote in message
news:1BA98509-CEE9-47E6-AE11-57959FB36551@xxxxxxxxxxxxxxxx
I installed a sample version of Visio over the internet. Now I get a
constant
error in Project every time I hit enter where it asks if I want to
intall
Voice Recognition. To get rid of the box, I tried to install files
needed
from Visio. Nada. My sample version is evidently not enough.

Now what do I do to get rid of this tiresome error relating to both
Project
and Visio?

llw


.


Quantcast