Re: How can I change the time scale?
In article <53B9A047-4F25-4884-83F6-4FA02C37DF2F@xxxxxxxxxxxxx>,
"Adam" <Adam @discussions.microsoft.com> wrote:
I changed my timescale to show as day 1,2,3,...etc., I grouped in 10 day
intervals, which works fine, but the lable on the time scale starts showing
as 3, 13, 23, 33, etc.
My project starts on the 1st day and I want it to lable as 1, 10, 20, 30,
etc. How Can I fix that???
Adam,
I assume by "grouped in 10 day intervals" you mean the timescale "count"
setting is "10".
My guess is that Tools/Options/Calendar tab is set for a week start of
Tuesday. Change the "week starts on" to Sunady and it should give what
you want.
John
Project MVP
.
Relevant Pages
- Re: Recycle bin sorting error
... I have had the same problem since upgrading to SP2. ... Have you managed to fix it? ... > top claiming this, the column is slightly shaded, showing this. ... and it has again forgotten how to sort items into ... (microsoft.public.windowsxp.general) - Re: Floor Spongy under LINO
... I cautioned him not to bath but to shower as I feel floor joists ... The best way to fix joists are to sister them and cut out any rot. ... Showing three cars outside blocking the house is not very ... (alt.home.repair) - Re: SP2 Installed - More missing apps
... give a report; just ended. ... So I searched for calc.exe after running sfc /scannow and it is ... notepad.exe is now showing up C:\WINDOWS\SYSTEM32 as well as the other ... >I think it would be best to use the Windows file checker to fix everything ... (microsoft.public.windowsxp.general) - Re: Ive lost admin privs, and I cant stop whats happening!
... Andy Max;3775404 Wrote: ... neither the hard drive nor the CD/DVD drive is showing up. ... Did you ever find a fix for this? ... roseanne's Profile: http://forums.techarena.in/member.php?userid=51303 ... (microsoft.public.windowsxp.help_and_support) - Re: Ive lost admin privs, and I cant stop whats happening!
... Andy Max;3775404 Wrote: ... neither the hard drive nor the CD/DVD drive is showing up. ... Did you ever find a fix for this? ... roseanne's Profile: http://forums.techarena.in/member.php?userid=51303 ... (microsoft.public.windowsxp.help_and_support) |
|