Help with error
- From: jduran <jduran@xxxxxxxxxxxxxxxxxxxxxxxxx>
- Date: Tue, 2 Aug 2005 08:47:05 -0700
I keep getting this error - I do have a table name listed - so I have to
assume that a blank field exists someplace. How can I get Project to accept
whatever is or is not there? What do I need to do to have the data download?
It is normal for some fields not to have information.
Data is being drawn from SQL Server 2000, MSDB database, sysjobhistory
table.
"The source table name is required.
One or more of the source table name fields are blank. A table name is
required for importing data."
.