I have a situation with four tasks, Task A (release drawings), Task B (build
tools), Task C (build assembly equipment), and Task D (build parts). Tasks B
and C can't start until Task A is complete. Task D can't start until Tasks B
and C are completed. In the original timeline, everything was linked
Finish-to-Start. Task B takes longer than Task C, and in order to prevent
being "late" with task C, I made it "As Late As Possible". This worked fine,
and Task B and C completed at the same time.
An opportunity came up to reduce the duration of Task B, but when I change
the duration of it, the other tasks don't update correctly. Task C maintains
its previous start and finish dates, with a big slack between the finish of
both Task A and Task B.

Any idea why, or how I can fix it?
.



Relevant Pages

  • Re: sl1 putting it away for the winter
    ... I put away a vehicle all winter every year and ... simply keep a battery trickle charger on it for the duration. ... > the snow) and to fix a few small things. ... Prev by Date: ...
    (rec.autos.makers.saturn)
  • Re: Fixing Start AND End Dates of tasks
    ... You really can't fix both start and end directly. ... making the task a fixed duration task and fixing the start date with a "Must ... to meet those dates and if the initial calculation says no, ...
    (microsoft.public.project)
  • Re: protect duration and work
    ... You cannot fix two of them. ... the Duration is the critical value and then lock it. ... If you lock Duration and you change Work, ... and the Task Type can be either Fixed ...
    (microsoft.public.project.pro_and_server)
  • Re: Differences in Task types
    ... Fixed task types only have an effect when you edit an assignment. ... So, Edit one, fix one and the third one gets recalculated. ... fix the duration and the units get recalculated when you click OK: ...
    (microsoft.public.project)
  • Re: Task Type Differences
    ... you would ever need to use a Fixed Work task. ... > Project uses the formula Work = Units * Duration ... > In this formula Units refers to resources. ... > If you Fix the Units, then adding resources means that you are overriding ...
    (microsoft.public.project)