RE: ATI Display Driver Crashes MS Project
- From: "MarkM" <MarkM@xxxxxxxxxxxxxxxxxxxxxxxxx>
- Date: Thu, 19 May 2005 18:17:02 -0700
Hi I experienced the problem today while at a training course..
I have a Dell D600 which uses a ATI Radeon Mobility 9000 Video Card
I tried re-installing, repairing, Service Packing, repairing office, but to
no avail
It first manifested itself in Project Web Access when attempting to load the
user list into the grid control, basically we got the error of a Divide By
Zero
I left the course with no solution and when i powered up back home not
plugged into the projector, it worked fine both in Project and Web Access
"rilecode@xxxxxxxxx" wrote:
> I have a Dell Precision Workstation 530 with an ATI X700 Pro video card
> installed running XPsp2. We use this as our conference room computer,
> so it is connected to both an Infocus LP640 and a std crt. Everything
> except MS Project 2003 works fine, if you set ATI's control panel to
> only use a single display MS Project works fine. We had the same
> problem earlier with an old ATI card, but were able to rollback the
> display driver and MS Project worked. Since this new video card does
> not have an old driver, we can't use that fix. ATI tech support says
> it is Microsoft's problem. The fix that was reported here earlier
> ("Crash Loop with PowerPoint and Projector" Apr 22) doesn't apply to
> our display driver.
>
> Has anyone else worked around this problem?
>
> Thanks for any assistance!
>
>
.
- Follow-Ups:
- Re: ATI Display Driver Crashes MS Project
- From: Steve House [Project MVP]
- Re: ATI Display Driver Crashes MS Project
- References:
- ATI Display Driver Crashes MS Project
- From: rilecode
- ATI Display Driver Crashes MS Project
- Prev by Date: Re: gantt chart actual duration
- Next by Date: How do i get a total of the duration for all Tasks?
- Previous by thread: ATI Display Driver Crashes MS Project
- Next by thread: Re: ATI Display Driver Crashes MS Project
- Index(es):
Relevant Pages
|