ATI Display Driver Crashes MS Project

Tech-Archive recommends: Fix windows errors by optimizing your registry



I have a Dell Precision Workstation 530 with an ATI X700 Pro video card
installed running XPsp2. We use this as our conference room computer,
so it is connected to both an Infocus LP640 and a std crt. Everything
except MS Project 2003 works fine, if you set ATI's control panel to
only use a single display MS Project works fine. We had the same
problem earlier with an old ATI card, but were able to rollback the
display driver and MS Project worked. Since this new video card does
not have an old driver, we can't use that fix. ATI tech support says
it is Microsoft's problem. The fix that was reported here earlier
("Crash Loop with PowerPoint and Projector" Apr 22) doesn't apply to
our display driver.

Has anyone else worked around this problem?

Thanks for any assistance!

.



Relevant Pages

  • Re: ATI Display Driver Crashes MS Project
    ... The one time I've had a similar problem it turned out to be, believe it or not!, that my default printer was set as a network printer that of course was unavailable when the laptop was not connected to the network. ... We had the same problem earlier with an old ATI card, but were able to rollback the display driver and MS Project worked. ... Since this new video card does not have an old driver, ... The fix that was reported here earlier doesn't apply to our display driver. ...
    (microsoft.public.project)
  • RE: ATI Display Driver Crashes MS Project
    ... I have a Dell D600 which uses a ATI Radeon Mobility 9000 Video Card ... > display driver and MS Project worked. ...
    (microsoft.public.project)
  • RE: SystemRootSystem32RDPDD.dll failed to load
    ... If you have an ATI ... Radeon video card and are not using the latest video driver out there, ... A simple fix my Higher Ed ... I rebooted the pc and the remote desktop ...
    (microsoft.public.windowsxp.work_remotely)
  • RE: Media Player freezes OS on video playback
    ... the latest ATI 4.1 catalyst drivers do NOT fix the problem. ... > display driver. ...
    (microsoft.public.windowsmedia.player)
  • Re: installation halt
    ... well my video card is nvidia 8600. ... I cant go to safe mode now coz it ... it said the display driver can not be reloaded....i went to safe ...
    (microsoft.public.windows.vista.installation_setup)