Re: Microsoft project crashes when I use a projector

Tech-Archive recommends: Repair Windows Errors & Optimize Windows Performance

From: Steve House [MVP] (sjhouse.remove.this_at_to.send.hotmail.com)
Date: 02/08/05


Date: Tue, 8 Feb 2005 09:07:19 -0500

I've never had a problem with using a projector but you mentioned something
that might be a clue as to what's going on. You said "...works in dual
screen configuration in my docking station." Do you mean you're using the
Win XP ability to have two monitors active at once, each displaying
independently of the other? Or are you talking about the more conventional
practice of plugging an external monitor into the video port on the laptop
and simultaneously displaying the same image on both the monitor and the
laptop's screen?

-- 
Steve House [MVP]
MS Project Trainer & Consultant
Visit http://www.mvps.org/project/faqs.htm for the FAQs
"Brian Houston" <Brian Houston@discussions.microsoft.com> wrote in message 
news:A28039C5-3D4F-45D3-80AD-0CA3F10FA9E5@microsoft.com...
> Just to update. I have service pack 1 installed. I have tried screen
> resolution changes and no effect. Microsoft Project works in dual screen
> configuration when I have it on my docking station and I can switch from a
> monitor to the laptop easily without it crashing. It is only when I plug 
> in
> one of the projectors and run a command in Project that Project crashes. I
> have tried a hard reboot with the projector connected and the run Project,
> tried switching it while running Project, tried switching it while project 
> is
> not running and every time Microsoft Project crashes.
>
> "Brian Houston" wrote:
>
>> When I try to use a projector with microsoft project 2003, project 
>> crashes. I
>> have tried with 2 types of projectors and the same results. I have also 
>> tried
>> 2 laptops and the same results. Is there a fix for this? 


Relevant Pages

  • Re: Microsoft project crashes when I use a projector
    ... Does the projector work with the laptop ok with other ... >> and simultaneously displaying the same image on both the monitor and the ... >>> tried switching it while running Project, ... >>> not running and every time Microsoft Project crashes. ...
    (microsoft.public.project)
  • RE: Microsoft project crashes when I use a projector
    ... one of the projectors and run a command in Project that Project crashes. ... tried switching it while running Project, tried switching it while project is ... not running and every time Microsoft Project crashes. ...
    (microsoft.public.project)
  • Re: Microsoft project crashes when I use a projector
    ... Welcome to this Microsoft Project newsgroup :-) ... > projector connected and the run Project, tried switching it while ... > every time Microsoft Project crashes. ...
    (microsoft.public.project)
  • OT Re: Blinking screen !
    ... MS MVP 1997 - 2008 ... Switching parts without getting other info is absolutely ridiculous. ... Use common sense when troubleshooting. ... You have no idea whether or not another monitor is available. ...
    (microsoft.public.windowsxp.help_and_support)
  • Re: ATI driver problem
    ... It is possible the X700AGPis switching to an unsupported range. ... I have an Iiyama ProLite E481S LCD monitor. ... this since the display blanks at the moment I load the drivers. ...
    (microsoft.public.windowsxp.hardware)