Re: Using Projects saved in an ODBC database

Tech-Archive recommends: Repair Windows Errors & Optimize Windows Performance

From: JackD (momokuri_at_gmail)
Date: 01/12/05


Date: Wed, 12 Jan 2005 10:08:59 -0800

This is the first I've heard of anyone saving to a VFP database. I'm not
sure that it is supported.
The documentation I have only mentions SQL Server and Oracle.
So, since it is not part of the spec, it is not a bug.

Here is some information about supported file formats.
http://office.microsoft.com/en-us/assistance/HP453045501033.aspx

-- 
-Jack  ... For project information and macro examples visit
http://masamiki.com/project
.
"Mike Fennell" <Mike Fennell@discussions.microsoft.com> wrote in message
news:C73FE631-7B0A-4931-BB9B-BBB04083FFF6@microsoft.com...
> When I try to Save a project in a Visual Foxpro 8 database using the ODBC
> connection I get a Microsoft Office Project Error (An unexpected error
> occured...) half way though saveing project, and I get an Microsoft ODBC
> error when I try to Open from an VFP8 ODBC connection.
>
> I have no troubles with a SQL 2000 ODBC connection.
>
> Is this a bug with Project Pro 2003 SP1.
>
> I have exported all the project tables created by Project 2003 from SQL
2000
> into VFP8 database before I started.


Relevant Pages

  • RE: Cannot connect to config db
    ... unable to do an odbc connection to the database. ... that was needed) and I was able to reattach the database. ... resolve the named instance of sql on my first node of the cluster. ... > Did you try to connect from the web server directly to the sql server (e.g. ...
    (microsoft.public.sharepoint.portalserver)
  • Re: Access FE link to two SQL database using ODBC...
    ... Do you mean creating another DSN for the other SQL ... Access FE ONLY for that SQL database and it is running fine. ... when Access FE link to two SQL databases and that ODBC connection pop up ...
    (microsoft.public.access.forms)
  • ODBC system DSN Issue
    ... I have a problem with SQL 2005, ODBC Connection, ... there is a 3rd party aplication that we use to access that SQL database every ... I did create ODBC connection with System DSN to the same Database but when ...
    (microsoft.public.sqlserver.odbc)
  • Link SQL table through VB Code
    ... I have an Access97 database and I would like to link a SQL table to it ... This is what I have so far to make the ODBC connection: ... Dim CnnStr As String ...
    (comp.databases.ms-access)
  • Fixed
    ... I also found this article that gives the proper way to move system dbs in sql 2008: ... The model exists where the master states it exists. ... This is the error log prior to detaching the model database. ...
    (microsoft.public.sqlserver.server)