Project: multiple resources no increase in duration
From: Becky0865 (Becky0865_at_discussions.microsoft.com)
Date: 12/13/04
- Next message: Mike Glen: "Re: Problem with "analyse timescaled data in Excel""
- Previous message: FR: "negative slack"
- Next in thread: Mike Glen: "Re: Project: multiple resources no increase in duration"
- Reply: Mike Glen: "Re: Project: multiple resources no increase in duration"
- Reply: Geordie [TMG]: "RE: Project: multiple resources no increase in duration"
- Messages sorted by: [ date ] [ thread ]
Date: Mon, 13 Dec 2004 13:29:05 -0800
I need to assign multiple resources to some shared tasks. The work is
occuring at the same time but Project is doubling the time duration. (eg. 4
hour meeting with 2 resource groups is showing as 8 hour total duration). i
don't want to have to make resource groups for each possible combination of
resources.
- Next message: Mike Glen: "Re: Problem with "analyse timescaled data in Excel""
- Previous message: FR: "negative slack"
- Next in thread: Mike Glen: "Re: Project: multiple resources no increase in duration"
- Reply: Mike Glen: "Re: Project: multiple resources no increase in duration"
- Reply: Geordie [TMG]: "RE: Project: multiple resources no increase in duration"
- Messages sorted by: [ date ] [ thread ]
Relevant Pages
|