Re: Installation of project 2003 server allowing internet access

Tech Tip: Click here to run a free scan for Windows Errors and optimize PC performance



Hi Luciano,

Try posting on the server newsgroup as this one is closing down. Please see
FAQ Item: 24. Project Newsgroups. FAQs, companion products and other useful
Project information can be seen at this web
address:http://project.mvps.org/faqs.htm .

Mike Glen
Project MVP




lucianofavaro@xxxxxxxxx wrote:
Hello, I am trying to install project server 2003 in my network in the
following way:

On my domain:
SQL server resides on a server and analysis server is on the same
server

Out of my domain:
I have a DMZ for internet access, so I've installed project server at
this server appointing to the internal SQL server database

I got some problems with this installation:

- not able to setup analysis server path
- in spite of my success in access project web via internet, when I
try to use project professional to access project server database over
internet i get some frustration .....

Considerations:
- I don't if I am able to access project server database over
internet. Has someone the experience to give me some tip?


Thanks in Advance

Luciano Fávaro.



.



Relevant Pages

  • Re: Urgent! New router and big disaster
    ... The SBS DNS server, running on ... its IP it means that your problem is now DNS. ... forward ports to it reliably in the router. ... I should have been more clear about internet connection.. ...
    (microsoft.public.windows.server.sbs)
  • Re: RWW Disconnecting
    ... I have been connected from a remote site for about 3 ... DHCP server and even a wireless access ... the key codes to for Internet access. ... Client Workstations} ...
    (microsoft.public.windows.server.sbs)
  • Re: Urgent! New router and big disaster
    ... I checked the binding order and the Server Local area connection is at the top. ... I should have been more clear about internet connection.. ... I wonder if I may have missed a firewall setting on the router as well. ...
    (microsoft.public.windows.server.sbs)
  • RE: remote access SBS 2003 Inop
    ... Since you know the problem is relate to RRAS (Routing and Remote Access ... On the SBS 2003 Server open the Server Management console. ... Click the "Connect to the Internet" link. ... Microsoft CSS Online Newsgroup Support ...
    (microsoft.public.windows.server.sbs)
  • RE: Catchall not working, EXTERNALLY?
    ... When I open the connection (over internet) to my exchange account, ... the data is stored on the Exchange server side. ... Microsoft CSS Online Newsgroup Support ...
    (microsoft.public.windows.server.sbs)