Re: MSP server 2002 vs 2003

Tech Tip: Click here to run a free scan for Windows Errors and optimize PC performance



Hi Robert,

Try posting on the server newsgroup as this one is closing down. Please see
FAQ Item: 24. Project Newsgroups. FAQs, companion products and other useful
Project information can be seen at this web
address:http://project.mvps.org/faqs.htm .

Mike Glen
Project MVP


Siggy wrote:
I have a MSP server 2002 implementation currently that seems to be
running fine for the most part. Problem is that it is very slow when
a user opens a project that has been published on the server. The
server power and network bandwidth are plentiful but it can still
take anywhere from 30 seconds to several minutes to open a program. These
programs are not complex, either - maybe 100 tasks or so max.

I'm wondering if someone can comment on the speed at which programs
open on server 2002 vs. server 2003. I've heard through the
grapevine that 2003 has made improvements in this area. Any other
must-have new features in 2003? I'm trying to build a justification
to upgrade to 2003. Thanks.
Robert



.



Relevant Pages

  • alt.2600 FAQ Revision .014 (1/4)
    ... The "Survival Guide" is a supplement to this FAQ and should be considered to be part of it. ... How do I attack a remote network across the Internet? ... This involves translations in which several different values are represented by the same character, which is why Unix passwords cannot be decrypted. ... The audit server database is called SYS$COMMON:VMS$AUDIT_SERVER.DAT and the audit log file is SYS$COMMON:SECURITY.AUDIT$JOURNAL. ...
    (alt.2600)
  • Re: Mail sent through IIS virtual SMTP server not arriving
    ... Juan T. Llibre, asp.net MVP ... asp.net faq: http://asp.net.do/faq/ ... does not respond to a connection attempt from my smtp virtual server. ... but I really don't know how to setup a virtual domain for my smtp ...
    (microsoft.public.dotnet.framework.aspnet)
  • Re: Improper communication between Project Server and WSS
    ... Try posting on the server newsgroup as this one is closing down. ... FAQ Item: 24. ... > selected Windows Sharepoint Services Site" ...
    (microsoft.public.project.pro_and_server)
  • Re: Publishing a Master Project. Is this a BUG ?
    ... Try posting on the server newsgroup. ... Please see FAQ Item: 24. ... The new project in which we just embedded is the master project ...
    (microsoft.public.project)
  • Re: HELP? How to Recover Lost File from Project Server/Offline limbo?
    ... Try posting on the server newsgroup. ... Please see FAQ Item: 24. ... and save in MPX format. ...
    (microsoft.public.project)