Re: Extranet/SSL setup



Cory:

The same advice applies to inquiry. Is there something you don't understand
about the installation guide instructions for installing a second front end
in the DMZ? These work a treat.

As for Citrix or Terminal Services, both require a server with a public IP
address or a VPN connection. If you've already got one of these pointing to
the Internet, you're in good shape. If not, the second front end is probably
a more economical solution.

--


Gary L. Chefetz, MVP
"We wrote the books on Project Server"
http://www.msprojectexperts.com

For Project Server FAQs visit
http://www.projectserverexperts.com

For Project FAQs visit
http://www.mvps.org/project


<cory.craig@xxxxxxxxxxxxxxxxxxx> wrote in message
news:1125497717.377785.80100@xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
> Hello,
>
> I have just setup Project server for a client of mine and they also
> want to allow external users to have access to the Web access client.
> They will only be documenting there tasks completions. In the
> installation guide it says I need to install another instance of PS
> 2003 and WSS....then make some registry changes and such. Is that the
> only way? Can someone explain options in summary? Like:
> 1. Install PS 2003 on another server pointing to the PS 2003
> server..IIf virtual, how does that work?
> 2. Using Citrix - (how?)
> 3. Terminal Services (how?)
>
> I am not a Network guru by any means so I am needing a clearer
> explination on installing another instance of PS2003 to allow extranet
> access. Is that a virtual server? Do I need to tell my client to make
> room on another server so I can install Project Server on it?
>
> Any guidance on this matter would be appreciated.
>
> Thanks in advance!
> Cory Craig
> craicd@xxxxxxxxxxxxxxxxxxx
> Gary L. Chefetz [MVP] wrote:
>> Ian:
>>
>> IMO, the installation guide has very good instructions on this. Is there
>> something in particular you don't understand?
>>
>> --
>>
>>
>> Gary L. Chefetz, MVP
>> "We wrote the books on Project Server"
>> http://www.msprojectexperts.com
>>
>> For Project Server FAQs visit
>> http://www.projectserverexperts.com
>>
>> For Project FAQs visit
>> http://www.mvps.org/project
>>
>>
>> "Ian Wolstenholme" <IanWolstenholme245@xxxxxxxxx> wrote in message
>> news:u%23tDpLLpFHA.1044@xxxxxxxxxxxxxxxxxxxxxxx
>> >I urgently need some information on the specific steps involved to
>> >install
>> >Project server 2003 to allow Extranet access. I have reviewed the
>> >installation and configuration planning guides but these don't appear to
>> >be
>> >too specific on the exact steps on how to deal with this. I'd
>> >appreciate
>> >your assistance.
>> >
>> > Thanks
>> >
>> > Ian
>> >
>


.



Relevant Pages

  • Re: Uploading Documents or Pictures
    ... > guide for your two box installation. ... > I think I remember for instance that the SQL needed to be mixed mode (SQL ... > and Windows authentication) because Project Server required one mode and WSS ... > Mike Walsh, Helsinki, Finland ...
    (microsoft.public.sharepoint.windowsservices)
  • PServer2003 not working after being restarted
    ... "installation ended prematurely". ... Project was unable to log you on at this time because the Project Server ... Source: MSSOAP ... SOAP Error: Loading of the WSDL file failed. ...
    (microsoft.public.project.pro_and_server)
  • Re: How to Install and Configure SharePoint Team Services for Microsoft Project Serv
    ... It's a mistake to try to install SharePoint Team Services on a Project ... Server 2003 machine as Project Server 2003 comes with the follow-up product ... Windows SharePoint Services as part of a Project Server 2003 installation is ... This newsgroup is primarily for standalone WSS but also covers common WSS ...
    (microsoft.public.sharepoint.windowsservices)
  • Re: Extranet/SSL setup
    ... the installation guide has very good instructions on this. ... "We wrote the books on Project Server" ... For Project Server FAQs visit ...
    (microsoft.public.project.pro_and_server)
  • Re: Install problem with Project 2007 when Office 2007 installed
    ... On installation issues, your next step would be Microsoft Support. ... "We wrote the books on Project Server" ... For Project Server FAQs visit ... that's what I did - but couldn't see any Office related beta stuff. ...
    (microsoft.public.project)

Loading