Re: Multiple instances
From: Gary L. Chefetz \(MVP\) ("Gary)
Date: 02/02/05
- Next message: Gary L. Chefetz \(MVP\): "Re: Page Error with Data Grid"
- Previous message: Gary L. Chefetz \(MVP\): "Re: Remember my password"
- In reply to: Maruf: "RE: Multiple instances"
- Next in thread: Maruf: "Re: Multiple instances"
- Reply: Maruf: "Re: Multiple instances"
- Messages sorted by: [ date ] [ thread ]
Date: Tue, 1 Feb 2005 22:24:10 -0500
Maruf:
This could be related to MDAC. Try upgrading your server and workstation to
2.8
-- Gary L. Chefetz, MVP "We wrote the books on Project Server" http://www.msprojectexperts.com - "Maruf" <Maruf@discussions.microsoft.com> wrote in message news:421D9619-B74E-478B-9495-BD1DC99FA162@microsoft.com... > I created a new site and am able to login. but the foll fails: > 1. Assigned task to resource. > 2. Logged onto PWA as resource <can see the message "1 new task is assigned > to you"> > 3. when i goto taskpage, it automatically redirects me to home and i cannot > complete the task. > Has anyone faced this prob? > same problem is faced while Checking in Projects....cant check in my > projects as well. > > Let me know if someone can help me. > > -Maruf > maruf.dolani@gmail.com > > > "Keith" wrote: > > > I played around with tool and was able to successfuly deploy a multi-instance > > install; one production, one demo. The install uses seperate project > > databases, seperate sharepoint databases, and uses the same wss admin > > database. You can set it up using a seperate w3 site within iis or you can > > add it to the existing site. I chose to use the same w3 site. > > > > I first created a new project database, populated it by running setupdb, > > which is documented in the install guide under Deploy the Database-> Creating > > the project server database manually. Assuming you are wanting to run sp1 > > for production, make sure to update the demo database as well. I forgot to > > do this and had some major issues when trying to add a new project from > > project pro. > > > > After getting the database created and updated, make sure to assign > > MSProjectServer & MSProjectRole roles to the new databases. Run editsite, > > create the site. After the new wss instance is created, go to the project > > install, go to Microsoft WSS -> WSS Configuration Wizard and run this against > > the new wss intance. > > > > If you are having database issues, verify your MSProjectServerUser and > > MSProjectUser passwords. Run the test and also verify those roles have the > > proper permissions. Also, I noticed that on my production instance (the one > > MS installed), if I would run a test, it would fail. By default, my install > > had MSProjectServerUser in the MSProjectMember Role text box under editsite. > > I changed this from MSProjectServerUser to MSProjectUser and it passes. > > > > Keith > > > > "MartinG" wrote: > > > > > We have created an additional instance of server using the download suggested > > > by Dale and it worked just fine - there is also further info on the tool in > > > appendix C to the server installation guide. We are having problems getting > > > the second server instance to see our development database so would > > > appreciate any tips you may come up with to do this. > > > > > > MartinG > > > > > > "Keith" wrote: > > > > > > > I've been told Project Server 2003 is capable of running a multi-instance > > > > environment. Can anyone point me to some documentation that goes into depth > > > > on the install and configuration? > > > > > > > > thanks, > > > > Keith
- Next message: Gary L. Chefetz \(MVP\): "Re: Page Error with Data Grid"
- Previous message: Gary L. Chefetz \(MVP\): "Re: Remember my password"
- In reply to: Maruf: "RE: Multiple instances"
- Next in thread: Maruf: "Re: Multiple instances"
- Reply: Maruf: "Re: Multiple instances"
- Messages sorted by: [ date ] [ thread ]
Relevant Pages
|