Re: Errors publishing to Project Server 2003
From: ProjMan (geisslerb_at_yahoo.com)
Date: 11/23/04
- Next message: Barbara B.: "Re: Generic Resource and Booking Type"
- Previous message: Dale Howard [MVP]: "Re: Generic Resource and Booking Type"
- In reply to: PottsNet2: "Errors publishing to Project Server 2003"
- Next in thread: PottsNet2: "Re: Errors publishing to Project Server 2003"
- Reply: PottsNet2: "Re: Errors publishing to Project Server 2003"
- Reply: PottsNet2: "Re: Errors publishing to Project Server 2003"
- Messages sorted by: [ date ] [ thread ]
Date: 23 Nov 2004 15:39:07 -0800
John,
Just to let you know you are not alone with this particular problem.
I have the same problem with a client that has installed Project
Server 2003 and has the services running under the 'Local Service'
account. I have been working to resolve this issue and I can tell you
the following:
1) I have not gotten a resolution from MSFT yet.
2) I have found in the documentation that it states that the 'Project
Server Scheduled Process Service (PJSchSvc)', which incidently runs
every 30 min, needs to be assigned a 'Log On As' with an account that
has AD read permission. I wouldn't think this would matter if you are
not synch with AD. However, we didn't setup AD synch with my client
and they are getting this problem.
3) I have posted an entry to the Partner Managed Newsgroups on
Microsoft site and I am awaiting a response.
4) If this problem is not resolved by tomorrow I will be working with
a Microsoft Support Specialist to resolve the issue.
For now I would recommend changing the 'Log On As' account to a domain
account with AD read access for the Scheduled Process Service. Stay
tuned for more...
PottsNet2 <PottsNet2@discussions.microsoft.com> wrote in message news:<A109C732-DC73-418B-B2FA-EF562AB4D6D3@microsoft.com>...
> Sorry in advance for the long post but wanted to provide as much info as
> possible.
> We have a W2k3 server hosting all components of Project Server as well as
> Project
> Pro for testing. Currently, when publishing from Project Pro, individual
> projects are
> listed in the PWA Projects list but give the "not published..." dialog when
> any one is selected. The project(s) can be reopened, changed and saved by
> Project Professional. The event log errors listed below are generated with
> each attempt. I have deleted all testing projects (through PWA Admin) and
> attempted to publish a *new* project from Project Pro to elliminate problems
> with duplicate objects and corrupted project database entries. When the new
> project is published, the Project Spooler icon in the system tray changes to
> indicate that it is processing the XML file fed to it and the file gets
> deleted from the folder. I have verified permissions for the ViewDrop folder
> as well as the DSN attributes and site properties viewed through EditSite.
> The last error listed is from the security event log and occurs at the same
> time that the others start. The Local Service account had been given explicit
> permissions to the registry key (and subkeys) listed but they seem to be lost
> when the server is bounced.
>
> Thanks in advance!
>
> Event Type: Warning
> Event Source: Microsoft Project Server Tracing Eventlog Provider
> Event Category: None
> Event ID: 1
> Date: 11/15/2004
> Time: 3:52:13 PM
> User: NT AUTHORITY\LOCAL SERVICE
> Computer: JOA006
> Description:
> Component: Views Notification Service
> File: C:\Office\devsp\project\pcportal\source\viewsnotify\ViewNotify.cpp
> Line: 207
> Error Number: 0x800a0005
> Description: <Description><![CDATA[View scheduler received error while
> scheduling views]]></Description>
> ___________________________________
>
> Component: PCSViews
> File: ViewsDrop.cls
> Line: -1
> Error Number: 0x5
> Description: <Description><![CDATA[Error Information: Invalid procedure call
> or argument
> Additional Information: An error occured processing the following view :-
> <ViewsDropData><ProjectData><EntProjectName><![CDATA[ChkConn.Published]
> ]></EntProjectName><EntProjectID>4</EntProjectID></ProjectData><OrgGuid>projectserver</OrgGuid><ProjectID>105</ProjectID><BasePath>projectserver</BasePath><TimeStamp>2004-11-15T15:52:12</TimeStamp></ViewsDropData>
> ]]></Description>
>
> -------------------------------------------------------------------------------------------------------------------------------------------
>
> Event Type: Error
> Event Source: Microsoft Project Server Tracing Eventlog Provider
> Event Category: None
> Event ID: 2
> Date: 11/15/2004
> Time: 3:52:13 PM
> User: NT AUTHORITY\LOCAL SERVICE
> Computer: JOA006
> Description:
> File: C:\Office\dev\project\WebClient\source\utility\pjadorsutil2.cpp
> Line: 841
> Error Number: 0x800a0cc1
> Description: <Description><![CDATA[Assert Detected. The error code was also
> included.]]></Description>
> ___________________________________
>
> Component: ADODB.Recordset
> Description: <Description><![CDATA[Item cannot be found in the collection
> corresponding to the requested name or ordinal.]]></Description>
>
>
> -------------------------------------------------------------------------------------------------------------------------------------------
> Event Type: Error
> Event Source: Microsoft Project Server Tracing Eventlog Provider
> Event Category: None
> Event ID: 2
> Date: 11/15/2004
> Time: 3:52:13 PM
> User: NT AUTHORITY\LOCAL SERVICE
> Computer: JOA006
> Description:
> Component: PjViewMgr
> File: C:\Office\dev\project\WebClient\source\server\pjviewmgr\ViewCreator.cpp
> Line: 1909
> Error Number: 0x800a0cc1
> Description: <Description><![CDATA[Assert Detected. The error code was also
> included.]]></Description>
>
> -------------------------------------------------------------------------------------------------------------------------------------------
> Event Type: Error
> Event Source: Microsoft Project Server Tracing Eventlog Provider
> Event Category: None
> Event ID: 2
> Date: 11/15/2004
> Time: 3:52:13 PM
> User: NT AUTHORITY\LOCAL SERVICE
> Computer: JOA006
> Description:
> Component: PjViewMgr
> File: C:\Office\dev\project\WebClient\source\server\pjviewmgr\ViewCreator.cpp
> Line: 1506
> Error Number: 0x800a0cc1
> Description: <Description><![CDATA[Assert Detected. The error code was also
> included.]]></Description>
>
> -------------------------------------------------------------------------------------------------------------------------------------------
> Event Type: Error
> Event Source: Microsoft Project Server Tracing Eventlog Provider
> Event Category: None
> Event ID: 2
> Date: 11/15/2004
> Time: 3:52:13 PM
> User: NT AUTHORITY\LOCAL SERVICE
> Computer: JOA006
> Description:
> Component: PjViewMgr
> File: C:\Office\dev\project\WebClient\source\server\pjviewmgr\ViewCreator.cpp
> Line: 1097
> Error Number: 0x800a0cc1
> Description: <Description><![CDATA[Assert Detected. The error code was also
> included.]]></Description>
>
> ---------------------------------------------------------------------------------------------------------------------------------------------
> Event Type: Error
> Event Source: Microsoft Project Server Tracing Eventlog Provider
> Event Category: None
> Event ID: 2
> Date: 11/15/2004
> Time: 3:52:13 PM
> User: NT AUTHORITY\LOCAL SERVICE
> Computer: JOA006
> Description:
> Component: PjViewMgr
> File: C:\Office\dev\project\WebClient\source\server\pjviewmgr\ViewCreator.cpp
> Line: 1164
> Error Number: 0x800a0cc1
> Description: <Description><![CDATA[Assert Detected. The error code was also
> included.]]></Description>
>
> ------------------------------------------------------------------------------------------------------------------------------------------
> Event Type: Error
> Event Source: Microsoft Project Server Tracing Eventlog Provider
> Event Category: None
> Event ID: 2
> Date: 11/15/2004
> Time: 3:52:13 PM
> User: NT AUTHORITY\LOCAL SERVICE
> Computer: JOA006
> Description:
> Component: PCSViews
> File: ViewsDrop.cls
> Line: -1
> Error Number: 0x5
> Description: <Description><![CDATA[Error Information: Invalid procedure call
> or argument
> Additional Information: An error occured processing the following view :-
> <ViewsDropData><ProjectData><EntProjectName><![CDATA[ChkConn.Published]
> ]></EntProjectName><EntProjectID>4</EntProjectID></ProjectData><OrgGuid>projectserver</OrgGuid><ProjectID>105</ProjectID><BasePath>projectserver</BasePath><TimeStamp>2004-11-15T15:52:12</TimeStamp></ViewsDropData>
> ]]></Description>
>
> ------------------------------------------------------------------------------------------------------------------------------------------
> Event Type: Warning
> Event Source: Microsoft Project Server Tracing Eventlog Provider
> Event Category: None
> Event ID: 1
> Date: 11/15/2004
> Time: 3:52:13 PM
> User: NT AUTHORITY\LOCAL SERVICE
> Computer: JOA006
> Description:
> Component: Views Notification Service
> File: C:\Office\devsp\project\pcportal\source\viewsnotify\ViewNotify.cpp
> Line: 212
> Error Number: 0x800a0005
> Description: <Description><![CDATA[The views processor failed to process the
> following document:
>
> <ViewsDropData><ProjectData><EntProjectName><![CDATA[ChkConn.Published]
> ]></EntProjectName><EntProjectID>4</EntProjectID></ProjectData><OrgGuid>projectserver</OrgGuid><ProjectID>105</ProjectID><BasePath>projectserver</BasePath><TimeStamp>2004-11-15T15:52:12</TimeStamp></ViewsDropData>
> ]]></Description>
>
> ---------------------------------------------------------------------------------------------------------------------------------------------
> Event Type: Failure Audit
> Event Source: Security
> Event Category: Object Access
> Event ID: 560
> Date: 11/15/2004
> Time: 4:30:39 PM
> User: NT AUTHORITY\LOCAL SERVICE
> Computer: JOA006
> Description:
> Object Open:
> Object Server: Security
> Object Type: Key
> Object
> Name: \REGISTRY\MACHINE\SOFTWARE\Description\Microsoft\Rpc\UuidTemporaryData
> Handle ID: -
> Operation ID: {0,755572}
> Process ID: 332
> Image File Name: C:\Program Files\Microsoft Office Project Server
> 2003\BIN\VWNOTIFY.EXE
> Primary User Name: LOCAL SERVICE
> Primary Domain: NT AUTHORITY
> Primary Logon ID: (0x0,0x3E5)
> Client User Name: -
> Client Domain: -
> Client Logon ID: -
> Accesses: Query key value
> Set key value
>
> Privileges: -
> Restricted Sid Count: 0
> Access Mask: 0x3
- Next message: Barbara B.: "Re: Generic Resource and Booking Type"
- Previous message: Dale Howard [MVP]: "Re: Generic Resource and Booking Type"
- In reply to: PottsNet2: "Errors publishing to Project Server 2003"
- Next in thread: PottsNet2: "Re: Errors publishing to Project Server 2003"
- Reply: PottsNet2: "Re: Errors publishing to Project Server 2003"
- Reply: PottsNet2: "Re: Errors publishing to Project Server 2003"
- Messages sorted by: [ date ] [ thread ]
Relevant Pages
|