Re: Viewdrop folder

Tech Tip: Click here to run a free scan for Windows Errors and optimize PC performance

From: David (David_at_discussions.microsoft.com)
Date: 10/31/04


Date: Sun, 31 Oct 2004 02:02:02 -0800

On checking the Event Viewer I am getting the following errors:

The Serv-U FTP Server service failed to start due to the following error:
The system cannot find the file specified.
Event ID:7000.

Source: Dnsapi
EventID: 11152
The system failed to register network adapter with settings..

Source:Netlogon
EventID: 5719
No Windows NT or Windows 2000 Domain Controller is available for domain.
There are currently no logon servers available to service the logon request.

The server is Windows 2000. I am able to logon to the server using the
domain name (even though the above errors are indicated in the Event
Viewer). All web users & Project users are able to access the Project
Server. The only problem being faced is in the Publish not being updated on
the Web views.

Please inform what else has to be checked on the configuration?

Regards,
David.

"Gary L. Chefetz (MVP)" wrote:

> David:
>
> I've never seen this happen without errors showing up in the Application
> Event logo on the server, but I guess there's always a first time. I'd say
> look at permissions on the ViewDrop folder but authentication problems would
> certainly throw errors in the logs.
>
> --
>
> Gary L. Chefetz, MVP
> "We wrote the books on Project Server"
> http://www.msprojectexperts.com
>
> -
> "David" <David@discussions.microsoft.com> wrote in message
> news:8C45B3BC-6530-4AC6-A285-1B00D96AF97B@microsoft.com...
> > There are no error logs in the Event Viewer. The system was working fine
> with
> > project publish when all of a sudden I am facing this problem of files
> > getting stuck in the Viewdrop folder. I have reset the com+ settings still
> no
> > results. I can only publish currently by emptying the Viewdrop folder &
> the
> > first file sent to publish in the list publishes but this file still
> remains
> > in the Viewdrop folder. Please help!!
> >
> > Regards,
> > David.
> >
> > "Gary L. Chefetz (MVP)" wrote:
> >
> > > David:
> > >
> > > This indicates that your system isn't correctly installed and
> configured.
> > > So, what someone needs to do, is diagnose the issue by either reviewing
> your
> > > installation logs to determine what step was missed, or simply diagnose
> the
> > > system to see why publishing is failing. You can start by reviewing the
> > > errors you're seeing in the application event log on the server. Post
> these
> > > here.
> > >
> > > --
> > >
> > > Gary L. Chefetz, MVP
> > > "We wrote the book on Project Server
> > > http://www.msprojectexperts.com
> > >
> > > -
> > > "David" <David@discussions.microsoft.com> wrote in message
> > > news:7F796EB6-C642-418C-8C5E-1244DF1B846B@microsoft.com...
> > > > While updating & publishing the existing projects, the xml files get
> stuck
> > > in
> > > > the Viewdrop folder & changes does not appear in the Project view.
> > > > When the Viewdrop folder is cleared & project republished the first
> > > project
> > > > published appears but the file gets stuck in the Viewdrop folder.
> > > > Subsequently for all the other publishes it get stuck & no changes in
> the
> > > > Proejct view.
> > > > Only when the Viewdrop is cleared, the first project which is
> published
> > > > appears & all other get stuck.
> > > > Could someone explain what has to be done????
> > > >
> > > > Regards,
> > > > David.
> > >
> > >
> > >
>
>
>



Relevant Pages

  • Re: Finding Account Lockout Source
    ... I have been able to use the event viewer tool that is in the ... Computer: "Server 123" ... Logon Failure: ...
    (microsoft.public.win2000.security)
  • Re: windows xp home edition taking ages to boot up
    ... Spanner are you using the Live Comunications Server 2005? ... that in network connections you have 1 local area connection is that right. ... Description of Windows XP and Windows Server 2003 System ... You can access Event Viewer by selecting Start, ...
    (microsoft.public.windowsxp.help_and_support)
  • Exchange wont start, problems with the event viewer
    ... One of my customers server was hacked (I presume because we forgot to setup ... Problem 1: Event Viewer going crazy! ... Problem 3: Dependencies are disabled! ... following system components" and "The following system components depend on ...
    (microsoft.public.windows.server.sbs)
  • Re: Windows XP pro system backup error
    ... Error messages are a waste of ... I changed the shadow copy checkbox on the ... If not Windows Server 2003 what about Small Business Server? ... Can you please post copies of relevant Error Reports from Event Viewer. ...
    (microsoft.public.windowsxp.perform_maintain)
  • Re: DCom got error Overlapped I/O operation is in progress.....
    ... > running on that server, and I've been getting the error message in my ... > unable to logon .\IWAM_servername in order to run the server. ... Get the Event ID from the event viewer and go to www.eventid.net to look it ... Please reply to the newsgroup. ...
    (microsoft.public.inetserver.asp.general)