Re: project manager cannot connect with MS Project Pro
From: Veronika (Veronika_at_discussions.microsoft.com)
Date: 10/19/04
- Previous message: Veronika: "RE: project manager cannot connect with MS Pj Pro"
- In reply to: Gary L. Chefetz \(MVP\): "Re: project manager cannot connect with MS Project Pro"
- Messages sorted by: [ date ] [ thread ]
Date: Tue, 19 Oct 2004 00:59:01 -0700
The latest update:
i reapplied all permissions and rights i could in the PM group, and it
somehow got through, so he can (finally) connect.
Thank you very much for your assistance!
Veroniq
"Gary L. Chefetz (MVP)" wrote:
> Veroniq:
>
> Is this user able to connect if he logs into another machine?
>
> --
>
> Gary L. Chefetz, MVP
> "We wrote the book on Project Server
> http://www.msprojectexperts.com
>
> -
> "Veroniq" <Veroniq@discussions.microsoft.com> wrote in message
> news:23117142-6B7C-4137-B300-A365FB7BE6A6@microsoft.com...
> > Hallo,
> > we have the following issue:
> > New project manager cannot connect to the Project server with MS Project
> > Pro. He is getting this dialog:
> > "The Microsoft Project Server database is unavailable.
> > You can´t access the dtb for one of the following reasons:
> > There is a problem with the enterprise global template in the database.
> > You do not have sufficient permission to access the enterprise global
> > template.
> > Network problems are preventing access.
> > The Microsoft Project Server does not have enterprise features enabled."
> >
> > The Pj Server as well as the database server is up and running. There are
> no
> > errors in the MS PjServer Event log.
> > All enterprise features are enabled.
> > All other users have no problems with the connection.
> > The connection to the server has been verified successfully.
> > He has the same rights and permissions as other project managers.
> >
> > I have uninstalled the MS PjPro on his computer, restarted it, deleted the
> > ActiveX controls, loggeg from his computer to the PWA site, dowloaded the
> > controls and reinstalled the MS PjPro. As is written in the Gary Chefetz
> > book. It did not help.
> >
> > Really don´t know what to do. Any help will be appreciated.
> >
> > Veroniq
>
>
>
- Previous message: Veronika: "RE: project manager cannot connect with MS Pj Pro"
- In reply to: Gary L. Chefetz \(MVP\): "Re: project manager cannot connect with MS Project Pro"
- Messages sorted by: [ date ] [ thread ]