Re: Access server using PP and domain account

From: Enomagic (enomagic_at_hotmail.com)
Date: 09/02/04


Date: Thu, 2 Sep 2004 13:08:47 +1000

By the way, UPN seems to work as well.

Cheers
Ben

"Enomagic" <enomagic@hotmail.com> wrote in message
news:e6xRQf0iEHA.1432@TK2MSFTNGP09.phx.gbl...
> You're a champion - this is gold.
> MS had told me this wasn't possible. Glad I surf these groups......
>
> Enomagic
>
> "Earl Lewis" <Earldotlewisatutahdotedu> wrote in message
> news:e$pxGouiEHA.4092@TK2MSFTNGP10.phx.gbl...
> > Enomagic,
> >
> > I suffered from the same (false) assumption about the workstation
> credentials. With Windows XP using the windows authentication isn't
strictly
> the credentials you use to login to the workstation. Read on...
> >
> > Let's try a checklist approach. And remember, this is what's working for
> me - your mileage may vary.
> >
> > This configuration assumes Windows XP Professional on workstation -
which
> is my case
> >
> > >>These are server configuration steps<<
> > - user account is setup on domain (in Active Directory) in which project
> server resides
> > - user account is created and setup on project server
> > - user account on project server is set to use windows authentication
> > - user ID in project server is entered in [domain]\username format
> >
> > >>These are workstation configuration steps<<
> > - project server URL is added to list of trusted sites in IE
> > - project server FQDN is added to list of network account passwords to
> store
> > (this is found in control panel>>user accounts>>[select desired
> account]>>manage network passwords
> > - make sure account information entered for this entry is the same as
the
> AD credentials
> > - you may need to add a DNS search suffix to your IP configuration to
> resolve the hostname to the FQDN
> >
> > Have you had a network guy on the far side watch for your incoming
traffic
> to see if it's making it into the target domain? They can do this with a
> sniffer program. Try to coordinate it with your tech support people if
there
> is such a thing.
> >
> > Hope that helps some.
> >
> > Earl
> >
> >
> >
> > >>> Enomagic<enomagic@hotmail.com> 8/24/2004 5:48:25 PM >>>
> > Earl,
> > I read that reply and having problems seeing the magic that gets this
> > scenario to work.
> > PWA is easy. No probs there.
> >
> > My conceptual issue is the fact that when you configure an account to
> > connect to ProjServer with, you only have the choice of proj auth (not
the
> > question here) and select "Use Windows user account" which is not
> > configurable and uses the credentials that you logged onto the
workstation
> > with - how do you get by this? What part of your setup gets around
this?
> >
> > Thanks
> > Enomagic
> >
> >
> > "Earl Lewis" <Earldotlewisatutahdotedu> wrote in message
> > news:ODwWqEfiEHA.592@TK2MSFTNGP11.phx.gbl...
> > > Enomagic (interesting moniker),
> > >
> > > To clarify, I am using windows authentication for project professional
> > against a project server that resides in a domain that my workstation
does
> > not belong to and I do not login to for any other purpose. In other
words
> I
> > use a local workstation login on startup and am able to successfully
> connect
> > to and run project pro and project web access from my workstation.
> > >
> > > See my post dated 8/17/2004 11:19:29 AM in reply to "SizzleMaster's
> > WWW-Authenticate header error" post.
> > >
> > > Earl
> > >
> > > >>> Enomagic<enomagic@hotmail.com> 8/22/2004 10:56:26 PM >>>
> > > Earl,
> > > the originater of this posting responded to me on .project.server
group
> > > saying I was wrong and that you said you were able to do what he
> > originally
> > > asked i.e. connect to Project Professional (PP) with a domain account
> when
> > > the client is not in the same domain as the server.
> > >
> > > I would be really interested in knowing how you have got around the
hard
> > > coding of the Project Professional client that gives you 2 options to
> log
> > > onto the Project Server - 1) using the "Use Windows user account"
option
> > > which only lets you use the account which you logged into the client
> > machine
> > > with, or 2) use a project server account (which isn't a domain
account).
> > >
> > > His comment was that I was wrong and the Earl said you could do it.
Is
> > this
> > > true, if so, this is of great benefit to us so could you please advise
> on
> > > how you managed to achieve this.
> > >
> > > Thanks in advance.
> > > Enomagic
> > >
> > > "Earl Lewis" <Earldotlewisatutahdotedu> wrote in message
> > > news:O4twfFJhEHA.3928@TK2MSFTNGP11.phx.gbl...
> > > > I connect to a project server in a domain that my workstation is not
a
> > > part of using all of the settings I mentioned in my reply to your
> earlier
> > > post. Please check that and see if it helps.
> > > >
> > > > Also, posting the same problem 4 or 5 times in the same day doesn't
> get
> > > any more attention than 1 well-written post. In fact some NG readers
> tend
> > to
> > > ignore posts like that. I know this is frustrating and you want an
> answer
> > > but sometimes it just takes time. Remember, this is voluntary for
> everyone
> > > here.
> > > >
> > > > Earl
> > > >
> > > > >>> SizzleMaster<larry@datasculpting.com> 8/17/2004 11:43:08 AM >>>
> > > > Can this be done? Or do you need to use a project server account?
If
> > the
> > > > latter, how do you reconcile these accounts so that one set of data
is
> > > > associated with both. I can't merge them in PS. I seem to need the
> > > domain
> > > > accounts in order to log into PWA and the SharePoint sites. If I
turn
> > off
> > > > Windows Auth and just use basic with SSL, I can't log into PWA.
> > > >
> > > > This is driving me nuts. Any help would be GREATLY appreicated.
> > > >
> > > >
> > > >
> > > >
> > >
> > >
> > >
> > >
> >
> >
> >
> >
>
>



Relevant Pages

  • Re: User Account Lockout
    ... Disable the IPSec Service on the workstation. ... Change the RPC Service to run as 'Local System Account'. ... I dont know if they were using old credentials. ... My Admin logs show this entry, total Occurrences 1,555. ...
    (microsoft.public.windows.server.sbs)
  • Re: User Account Lockout
    ... Disable the IPSec Service on the workstation. ... Change the RPC Service to run as 'Local System Account'. ... I dont know if they were using old credentials. ...
    (microsoft.public.windows.server.sbs)
  • Re: User login between domains in the same tree/frrest
    ... it would work the other way around too: move your workstation to the SG domain and try to log on with the rogerrabbit account and it should work. ... can a user from a parent domain not login to the child domain because he is ...
    (microsoft.public.windows.server.active_directory)
  • Changing passwords in different non trusted AD domains
    ... Press Ctrl-Alt-Delete. ... Then change the credentials used for the ... The user has an account in each separate ... >workstation in Domain A? ...
    (microsoft.public.win2000.security)
  • Re: New user cant login to Domain from workstations
    ... -I cannot login as the new user from ANY workstation (there is no ONE ... On the problamatic XP workstation, Control Panel, Users. ... Remove any stored passwords for the problamatic user. ... Right click the user account and select Reset Password. ...
    (microsoft.public.windows.server.sbs)