Re: issues with network client accessing PWA

From: Gary L. Chefetz \(MVP\) ("Gary)
Date: 07/15/04


Date: Thu, 15 Jul 2004 06:24:36 -0400

Jim:

Something is interfering with the machine's access to the database. Could it
be that a popup blocker is installed on this machine? Any other type of
browser add-ins? Is the browser an up to date version?

-- 
Gary L. Chefetz, MVP
"We wrote the book on Project Server
http://www.msprojectexperts.com
-
"Jim" <Jim@discussions.microsoft.com> wrote in message
news:A01E0AF8-2B00-4A17-9017-48A958BC5A6E@microsoft.com...
> Gary,
>
> I reinstalled MDAC 2.8 and rebooted the box and still had problems.  I
deleted the Active X controls and reinstalled them again (going through the
DOS window).  I still had problems.  I noticed messages saying error on page
on the browser status bar.  When I click there, I get the following:
>
> Line: 1756
> Char: 3
> Error: The specified procedure could not be found
> Code: 0
> URL: hppt://project/projectserver/admin/sec_users.asp
>
>
> This enbironment is a pworkgroup, not an AD, but I an get from this
machine to other mahcines without any problems.  Any more ideas?
>
> Thanks.
>
> Jim
>
>
>
> "Jim" wrote:
>
> > I have a PS 2003 running PWA in an enterprise environment.  I can access
the server through PWA just fine with the exception of 1 machine.  The
server is a trusted site and I tried removing and reinstalling Active X
controls on this PC.  I removed them via a DOS screen such that I got the
hidden files as well.  After reinstalling the Active X controls, I still
have issues.
> >
> > When I log in as Administrator or a member of the Administrator group, I
can't see the users when I go to Users and Groups.  When I go to the Project
Center, a Loading... message comes up, then it flashes a quick message which
I believe says no projects have been published for this user, and PWA goes
back to the PWA Home Page.  When I go to the Configure Server page, the
machine hangs for an inordinately long time, with the Loading data...
message and an hour glass.  (Inordinately long time = upwards of 10
minutes).  When it finally does come back, all that really happens is the
hour glass goes away and the Loading data... message is still there, but the
connection appears to be dead. No data is updated on the server.
> >
> > This happens regardless of the user account I use to access the machine.
I can get to the server via the MS Project 2003 client and open and publish
projects and other data just fine.  It's only PWA that has issues.  All the
other machines access PWA just fine as well.  The machines are XP Pro.  The
browser's homepage is not Google, so the pop-up blockers should not be an
issue.
> >
> > The only anomaly in my mind is that the network is a workgroup
environment, not AD or NT domain services.
> >
> > Any help on this one is greatly appreciated.


Relevant Pages

  • Re: Got TCP/IP connection, but no file sharing!?
    ... No where can I find that having the Computer Browser Service ... and the server announces itself on the networking using the special ... and why doesn't a workgroup environment work the same ... server) generally acts as the master browser. ...
    (microsoft.public.windowsxp.network_web)
  • Re: =?ISO-8859-1?Q?Can=92t_see_a_compute?= =?ISO-8859-1?Q?r_in_the_network?=
    ... Find Computer Browser ... Find Server ... Find Workstation ... CONFIG and Browser and Sharedaccess are RUNNING. ...
    (microsoft.public.windowsxp.network_web)
  • Re: After setting up the network
    ... Find Computer Browser ... Find Server ... PsService v2.20 - Service information and configuration utility ... CPSServ Comprehensive Networking Services V1.10 - PERRINS2 ...
    (microsoft.public.windowsxp.network_web)
  • Re: FreeBSD 5.1, Cups problem
    ... Server Identity ... > # Classification: the classification level of the server. ... the default language if not specified by the browser. ... > # not advertised but you can still see printers on other hosts. ...
    (freebsd-questions)
  • Re: BROWSTAT: ...Could not connect to registry, error = 53 (New question)
    ... I have found that I can resolve this message situation by mapping a drive share to the Master Browser machine. ... Now name resolution uses Server Message Blocks or SMBs. ... use the same SMB transport, or they will have no connection (causing, among ... NetBT setting, is not consistently effective. ...
    (microsoft.public.windowsxp.network_web)

Loading