Re: Problem installing PS2K3 on a single Win2K3 AD\SQL machine

From: Arno (idont_at_think.so)
Date: 07/14/04


Date: Wed, 14 Jul 2004 14:10:15 +0200

Thanx for the tip. TCP/IP was allready enabled.
But the authentication was Windows only (I thought I said both during the
install). Now it is both and the PS install accepts "connect using Windows
authentication"
MS walks in mysterious ways :-)

greetz,

Arno

"Gary L. Chefetz (MVP)" <gary.nospam at chefetz.org> wrote in message
news:exoUtvYaEHA.2632@TK2MSFTNGP10.phx.gbl...
> Arno:
>
> Your instance of SQL is configured to support Named Pipes transport only.
> You need to configure it to support TCIP. Open Enterprise Manager and
Expand
> the tree to your server. On the action menu, select properties. On the
> General Tab, select Network Configuration button and enable TCP/IP.
>
> --
>
> Gary L. Chefetz, MVP
> "We wrote the book on Project Server
> http://www.msprojectexperts.com
>
> -
> "Arno" <idont@think.so> wrote in message
> news:OAW#bQXaEHA.3512@TK2MSFTNGP12.phx.gbl...
> > Ha,
> >
> > Maybe I've to ask this in a SQL or Win newsgroup, but I want to start
> > here...
> >
> > I'v installed Win2K3 with AD on a single machine. After that I installed
> SQL
> > Server (2000 sp3) on that same machine. Now when I try to install PS2K3
I
> > can't get passed the "enter database server information". If I select
> > "Create a new database", it returns that it requires a mixed mode SQL
> > Server. When I switch to SQL Server authentication it replies that it
> can't
> > find the server.
> > My guess is that it has something to do with security on this AD
machine,
> > but what???
> >
> > I have to do all this on a single machine. It's for testing purpose and
we
> > don't have an AD domain here, so the sysboys won't like it when I hook
up
> > this AD machine to the network :-)
> >
> > Regards,
> >
> > Arno
> >
> >
>
>