Re: Can't login to Project Server from Project Professional 2003

Tech-Archive recommends: Repair Windows Errors & Optimize Windows Performance

From: Alastair Bell (AlastairBell_at_discussions.microsoft.com)
Date: 07/06/04


Date: Tue, 6 Jul 2004 10:48:01 -0700

For some reason when I have the site as a trusted zone as opposed to a local intranet zone I can't logon. When I attempt to connect to the server I get the message.

"Unexpected server response.
Project Server has returned an unexpected server response.
Click the View button to view the server response as an error in your browser."

When I click View I see the following web page

"You are not authorized to view this page
You do not have permission to view this directory or page using the credentials that you supplied because your Web browser is sending a WWW-Authenticate header field that the Web server is not configured to accept.
--------------------------------------------------------------------------------

Please try the following:

Contact the Web site administrator if you believe you should be able to view this directory or page.
Click the Refresh button to try again with different credentials.
HTTP Error 401.2 - Unauthorized: Access is denied due to server configuration.
Internet Information Services (IIS)"

The only way I seem to be able to get round this is to add the site as a local intranet zone, but then I run into the problem outlined in my first post.

-- 
Alastair Bell
"Gary L. Chefetz (MVP)" wrote:
> Alastair:
> 
> Moving the site to the trusted sites zone does not make it inaccessible to
> integrated security.
> 
> -- 
> 
> Gary L. Chefetz, MVP
> "We wrote the book on Project Server
> http://www.msprojectexperts.com
> 
> -
> "Alastair Bell" <AlastairBell@discussions.microsoft.com> wrote in message
> news:916EE424-3B89-4202-B8BE-5962A64AD679@microsoft.com...
> > I am running Project Prof on Windows Server 2003 and Project Server is
> running on a seperate Windows 2003 Server. Note the server with Project Prof
> is running Internet Explorer Enhanced Security Configuration.
> >
> > When I run Project Prof and attempt to connect to the server I get the
> following error message.
> >
> > "You cannot log in to the Project Server http://projectserver/projectsite
> because you have not identified http://projectserver/projectsite as a
> trusted site in Internet Explorer.
> > To continue, you should make the site http://projectserver/projectsite a
> trusted site in Internet Explorer."
> >
> > However I have made this site a local Intranet site so that I can connect
> using integrated security and moving the site to the trusted zone within
> Internet Explorer would remove it from the local Intranet Site preventing
> access using Integrated Security. How can I overcome this problem.
> >
> > -- 
> > Alastair Bell
> 
> 
> 


Relevant Pages

  • Re: Remembering Passwords on Windows Server 2003
    ... How to convert your Windows Server 2003 to a Workstation ... site must be located in Local Intranet Zone. ... For storing information (e.g. username and passwords) open IE and click on ...
    (microsoft.public.win2000.security)
  • RE: Cant browse SharePoint from the Windows 2008 Server itself
    ... I compared this behavior in my Windows 2003 server. ... the site was in the local intranet zone automatically (There is no ...
    (microsoft.public.sharepoint.portalserver)
  • Re: WinXP asks "run?" when users want to open an application on a
    ... refuses to open databases on a dfs network drive. ... I've tried to add our ad domain to the local intranet zone in Internet ... > You need to have the server that the drive points to, or, preferably, ... > torgeir, Microsoft MVP Scripting and WMI, Porsgrunn Norway ...
    (microsoft.public.windowsxp.general)
  • Re: disable warning when execute exe in drive z:...
    ... You need to have the server that the Z: drive points to (or the domain ... the server is in) defined as "Local intranet zone" ... Internet Explorer. ... -- torgeir, Microsoft MVP Scripting and WMI, Porsgrunn Norway Administration scripting examples and an ONLINE version of the 1328 page Scripting Guide: ...
    (microsoft.public.windowsxp.security_admin)
  • Re: Kerberos with Windows Integrated authentication
    ... It also explains why adding the server to the Local Intranet zone allows cached credentials to be used. ... I think that IE doesn't Kerberos ticket ... behaviour if your Web server is in the client broweser's Internet zone. ...
    (microsoft.public.windows.server.security)