Lost connection to Exchange Address Book

From: Brad (anonymous_at_discussions.microsoft.com)
Date: 06/25/04


Date: Fri, 25 Jun 2004 12:28:02 -0700

I have always used "New Resource From", Address Book to
populate a "user import" project and publish it. It
resulted in a somewhat clean user in PS. I would modify
security, etc and had myself a new Enterprise Resource.
Last year we upgraded to XP desktop and Windows2K on the
servers. Other than that, the application was not
touched and everything seems to work except this
feature. All three options are grayed out.

I've dug through everything I can find but have yet to
understand how this connection is performed. Also, we
switched to Native Mode on the network when we finally
got the last of the NT servers offline. It would be nice
to know how to set up AD also. I am not interested in
syncing at this time after looking thru all the notes but
I would like to know how to re-establish the Address Book
connector.

Much Thanks,
Brad



Relevant Pages

  • Re: SLOW
    ... shortcut or connection to a resource which user B owns? ... Like a shortcut to user Bs redirected printer or something like it? ... session is constantly looking for a resource which it can't find. ... MCSE, CCEA, Microsoft MVP - Terminal Server ...
    (microsoft.public.windows.terminal_services)
  • Re: I am a php noob and have a quick question
    ... $link, when a connection is established, is a resource id. ... for you to refer to this particular database connection. ... If you look up the mysql functions you will discover that some of them have ...
    (comp.lang.php)
  • Re: local v remote
    ... PHP version problem? ... probably connecting to a locally-hosted mysql installation. ... Are you using the same connection string when you upload? ... You should also always try to pass the resource to the mysql_query function ...
    (php.general)
  • Re: Dispose/Finalize
    ... As you point out the close command needs to be sent to the database, ... So for instance if you have a network connection, ... If I were to use an resource in one of my classes that needed cleaning ... If I was writing my own Dispose/Finalize, ...
    (microsoft.public.dotnet.framework.clr)
  • Re: local v remote
    ... valid MySQL result resource ... PHP version problem? ... Are you using the same connection string when you upload? ... You should also always try to pass the resource to the mysql_query function ...
    (php.general)

Loading