Re: Project Server Database Connection Issues

From: Gary L. Chefetz [MVP] (garyNOSPAM_at_chefetzDOTorg)
Date: 05/17/04


Date: Mon, 17 May 2004 13:05:31 -0400

Paul:

You missed the MDAC version, but upgrade it to 2.8 if it's not already 2.8.
Also, in the resulting logon box after the SQL error, check the box for Use
Trusted Connection and see if that helps.

-- 
Gary Chefetz [MVP]
http://www.msprojectexperts.com
We wrote the book on Project Server
"Paul Sander" <anonymous@discussions.microsoft.com> wrote in message
news:8B327A90-2F95-462C-9735-217D54302830@microsoft.com...
> Project Server version
>
>      Project Server 2002
>
> Project Client version
>
>      MS Project Professional 2002
>
> Client computer OS version and SP Level and MDAC version
>
> OS Name Microsoft Windows XP Professional
> Version 5.1.2600 Service Pack 1 Build 2600
> OS Manufacturer Microsoft Corporation
> System Manufacturer TOSHIBA
> System Model Satellite P15
> System Type X86-based PC
> Processor x86 Family 15 Model 2 Stepping 9 GenuineIntel ~2793 Mhz
> Processor x86 Family 15 Model 2 Stepping 9 GenuineIntel ~2793 Mhz
> BIOS Version/Date TOSHIBA V1.10, 8/22/2003
> SMBIOS Version 2.31
> Windows Directory C:\WINDOWS
> System Directory C:\WINDOWS\System32
> Boot Device \Device\HarddiskVolume1
> Locale United States
> Hardware Abstraction Layer Version = "5.1.2600.1106 (xpsp1.020828-1920)"
> Time Zone Central Standard Time
> Total Physical Memory 512.00 MB
> Available Physical Memory 255.10 MB
> Total Virtual Memory 1.72 GB
> Available Virtual Memory 1.27 GB
> Page File Space 1.22 GB
> Page File C:\pagefile.sys
>
>