Re: Hardware question

Tech Tip: Click here to run a free scan for Windows Errors and optimize PC performance

From: Marko (Marko_at_mmct.net)
Date: 04/29/04


Date: Thu, 29 Apr 2004 11:13:31 -0400


Brian K - Project MVP wrote:
> Marko wrote:
>
>
>>I have installed (for instructors), project/server 2002 on PIII
>>laptops and desktops. For demonstration, since they don't actually
>>handle a ton of users, its adequate.
>>
>>I will be setting up a new 2003 server for these guys and they are
>>buying a new pc for it (windows server, project server office,
>>project, sql server, iis)
>>
>>Question: is it better for them to invest in a high end processor or
>>slower but dual processor, any recommendations?
>>
>>TIA
>
>
> It would depend on how many of them there are and what kind of projects
> they have and how they plan on using the tool.
>
> Check out the www.microsoft.com/downloads page. Search for
> "Configuration Planning Guide". This doc will help you understand some
> of the scaling options. Post back here if you have further questions
> though.
>
I guess I wasn't clear, this setup is for one user in a teaching
scenario. A teacher/student wears different hats during exercises, e.g.
"project Manger" "OLAP administrator". They may have Project and several
PWA windows open but there is only one real user per system, e.g. an
exercise were one person wears several hats acting out several users at
once.

We did this with PIII/450s with 512/768 MB ram, or on laptops with less.
It is slow mainly when updating information involves all the servers,
that's why I think a dual slow processor whould be better than one
kickass processor

-- 
Marko Jotic, MMCT Holdings Int. Inc.
"Common sense is anything but common".
     From the notebooks of Lazarus Long. Robert A. Heinlein.
Handmade knives, antique designs, exotic materials at 
http://www.knifeforging.com/


Relevant Pages

  • RE: Is VMS losing the Financial Sector, also?
    ... the web from the server. ... being used means that all IE and IIS related security patches need to be ... Don't allow them on your network. ... I was talking about business laptops that are locked down. ...
    (comp.os.vms)
  • RE: Setting up laptops
    ... laptops user can do their normal work and can not install software on ... As you said, you want the user account can not install software on laptops, ... To enable OWA and VPN function on SBS: ... You have to rerun the CEICW to make sure your SBS 2003 server have right ...
    (microsoft.public.windows.server.sbs)
  • Office v.X crashes when opening documents
    ... This is affecting all our laptops. ... As normal, I have an Open Directory Master server, which is also running ... I also have defined on the same Open Directory server, ... then they will find NO printers available. ...
    (microsoft.public.mac.office)
  • Imaged Laptop Loses Network Connectivity Intermittently
    ... clients are DHCP enabled -- clients and servers exist on the same ... Two Closets contain 10 perimeter switches ... but the Exchange server pings time out. ... All of the laptops in question are of the same model -- Dell D620. ...
    (microsoft.public.windows.server.networking)
  • Re: My Annual Linux Adventure
    ... I have 12 workstations, two laptops, and 8 servers running Windows ... Windows 2003 Advanced Server. ... SUSE 9.1, Mandrake 10.0, and I'm trying to find a version of RH that I ...
    (alt.os.linux.redhat)