Re: Synchronization with AD Project 2003
From: Lars Hammarberg (lars.hammarberg_at_nospam-camako.se)
Date: 03/18/04
- Next message: Terminal: "Re: Project hangs when using Terminal Server"
- Previous message: John Beamish: "Re: remaining availability formula"
- In reply to: mike: "Re: Synchronization with AD Project 2003"
- Next in thread: mike: "Re: Synchronization with AD Project 2003"
- Messages sorted by: [ date ] [ thread ]
Date: Thu, 18 Mar 2004 20:44:21 +0100
Sorry - I'm running my AD sync tests on the AD server... that's why I
thought to ask about local system account - in "real life" this is often not
so. <blush>
Try changing the account the "Project Server Scheduled Process Service" is
running under to a domain account with sufficient rights to access the AD.
Don't know if this is required or if your policy settings allow any
registered computer to access these settings regardless.
-- /Lars Hammarberg www.camako.se MSProject Premier Partner "mike" <mmikey121@yahoo.com> wrote in message news:426a058d.0403181023.3668c16b@posting.google.com... > I have read all the threads and I still do not understand what is > missing. > > Does the local system account need access to AD? If so, where would I > give the system account these rights? > > I have tried a number of AD groups and continue to have this problem. > Further help is very much appreciated. > > The error message in event viewer is as follows.. > Component: AD Connector > File: AutoADProcess > Line: -1 > Description: <Description><![CDATA[AD Res Pool Sync - Accessing AD > Groups failed : (20004)FetchGroup: <Error><Component>AD Connector > </Component><File>AutoADProcess</File><Line>-1</Line><Number>0x4e24</Number> <Description><![CDATA[Failed > to get record of group lg_eng\lg-EVERYWHERE from active directory > global catalog] ]></Description></Error>]]></Description>
- Next message: Terminal: "Re: Project hangs when using Terminal Server"
- Previous message: John Beamish: "Re: remaining availability formula"
- In reply to: mike: "Re: Synchronization with AD Project 2003"
- Next in thread: mike: "Re: Synchronization with AD Project 2003"
- Messages sorted by: [ date ] [ thread ]
Relevant Pages
|