MSP_WEB_ASSIGNMENT
Tech Tip: Click here to run a free scan for Windows Errors and optimize PC performance
Date: Wed, 17 Mar 2004 00:26:10 -0800
Hi,
In one of the projects many assignments were removed, but
they still are in database in MSP_WEB_ASSIGNMENT.
I would not care but there are really a lot of them.
Is it safe to remove these assignments directly from
MSP_WEB_ASSIGNMENT table ?
I need to remove a specific resource assignments in
specific project. Is there any other way ?
Relevant Pages
- Re: Another view on analysis and ER
... Broken database. ... If you're issuing assignments, that is, deletes and inserts, then ... By not using the VIN, ... since there is a 1:1 correspondence between that which is ... (comp.databases.theory) - Re: A real world example
... use a temporal attribute to make the tuples in the database instance ... preceding a change correspond to tuples in the database instance ... issuing a series of assignments introduces its own problems. ... including those that are not included in the propositions about it. ... (comp.databases.theory) - Re: Database design, Keys and some other things
... In a typical personnel system, new employee ids are assigned by the HR department, and they are responsible, ultimately, for avoiding duplicate assignments. ... Exposing system owned data to users should be done only when necessary: error codes/messages, ... This excludes any data that might be used exclusively by the database. ... The database should have no other "hestitation" in providing any collected data or metadata within the constraints of security. ... (comp.databases.theory) - Re: A real world example
... use a temporal attribute to make the tuples in the database instance ... I was referring to why tuples between relation-values cannot correspond ... issuing a series of assignments introduces its own problems. ... including those that are not included in the propositions about it. ... (comp.databases.theory) - Re: Help - new user cant log in
... did miss the group assignments. ... > database permissions to use the database. ... > belong to. ... (microsoft.public.access.security) |
|