Re: Project server with sharepoint install
From: Gary L. Chefetz [MVP] (garyNOSPAM_at_chefetzDOTorg)
Date: 02/27/04
- Next message: Gary L. Chefetz [MVP]: "Re: Login failed for 'MSProjectServerUser'"
- Previous message: Gary L. Chefetz [MVP]: "Re: Problem still exist try to connect Srv from Pro"
- In reply to: Jim Baker: "RE: Project server with sharepoint install"
- Next in thread: RonSo: "Re: Project server with sharepoint install"
- Reply: RonSo: "Re: Project server with sharepoint install"
- Messages sorted by: [ date ] [ thread ]
Date: Fri, 27 Feb 2004 06:44:57 -0500
Jim:
Are you trying to install SharePoint Portal Server on the same machine as
Project Server? This doesn't fly. If you want to use both of these
applications, you'll need two machines.
-- Gary Chefetz [MVP] http://www.msprojectexperts.com We wrote the book on Project Server "Jim Baker" <jim.baker@rocknot.com> wrote in message news:532F681F-A629-49ED-AEA7-3060AF7754E4@microsoft.com... > > > ----- RonSo wrote: ----- > > Jim, It is important that you read through the Administrator and Installation guides. They list the specific steps you have to go through for a successful installation. Most importantly, you need to make sure you setup all of the appropriate service accounts and create the write SQL Server permissions and roles. If I remember correctly, the guides are oriented towards Sharepoint Services not Sharepoint Portal Server. Someone else may have specific recommendations on whether or not to install first with just Sharepoint Services and then upgrade to Sharepoint Portal Server. > > RonSo... > > thanks for the comments....and I do understand what you said...I have followed the installation guide almost word for word, step by step.....still nothing.. even went through the post install stuff.... > > I can't even access the Project web admin and config page...get a 404 error.....even wehn I try and navigate it through server manager.....
- Next message: Gary L. Chefetz [MVP]: "Re: Login failed for 'MSProjectServerUser'"
- Previous message: Gary L. Chefetz [MVP]: "Re: Problem still exist try to connect Srv from Pro"
- In reply to: Jim Baker: "RE: Project server with sharepoint install"
- Next in thread: RonSo: "Re: Project server with sharepoint install"
- Reply: RonSo: "Re: Project server with sharepoint install"
- Messages sorted by: [ date ] [ thread ]
Relevant Pages
|
Loading