Re: OLAP Cube - solution found!
From: Kasper Ovi (ovi_at_kabelnettet.dk)
Date: 02/03/04
- Next message: PP: "Project 2003: Administrative Project"
- Previous message: Michael: "can't rename projects"
- Messages sorted by: [ date ] [ thread ]
Date: Tue, 3 Feb 2004 10:14:33 +0100
Hi everybody
Yes, SP3a was installed, but in the meantime I also found the solution:
Installing Office 2003 (with OWC2003) as Gary suggested.
It's typical for a MS app: When you upgrade one component, ALL must be
upgraded. Fortunately, everything works when you do so ;-)
Thanks for your suggestions!
Kasper
"Hugues Perron" <hugues_perron@NOT_IN_ADDRESSglobetrotter.net> wrote in
message news:#2AJBT25DHA.1428@TK2MSFTNGP12.phx.gbl...
> Hi Kasper,
>
> Did you install SP3 of analysis services ? It could help
>
> Hugues
>
> "Gary L. Chefetz [MVP]" <garyNOSPAM@chefetzDOTorg> a écrit dans le message
> de news:O0Rv6hm5DHA.360@TK2MSFTNGP12.phx.gbl...
> > Kasper:
> >
> > For 2002, having Project Pro 2002 was enough without having the rest of
> the
> > XP Office suite to get the OWCs activated in full function mode. I can't
> say
> > for sure that has changed with 2003, but it very may well have.
> Alternately,
> > it may be that the fact that Office XP is also installed on the machine
is
> > the root of the problem. Try again by deleting the OWCs and Office XP
and
> > install Project 2003 before going to the page. At least one Office 2003
> > application must be on the machine to get the proper version of the OWCs
> if
> > the rule is the same for 2003.
> >
> > --
> >
> > Gary Chefetz [MVP]
> > http://www.msprojectexperts.com
> > We wrote the book on Project Server
> >
> >
> > "Kasper Ovi" <ovi@kabelnettet.dk> wrote in message
> > news:y97Sb.6526$BC2.4418@news.get2net.dk...
> > > Hi Gary
> > >
> > > I uninstalled both Office XP and Office Project 2003, and installed
the
> > web
> > > components from PWA when I was asked to do so.
> > > After installation I tried creating a new view, but the same problem
> > > appeared.
> > >
> > > Can the problem be that I don't have Office 2003?
> > >
> > > Thanks
> > > Kasper
> > >
> > > "Gary L. Chefetz [MVP]" <garyNOSPAM@chefetzDOTorg> wrote in message
> > > news:u0pZ1vd5DHA.2404@TK2MSFTNGP11.phx.gbl...
> > > > Kasper:
> > > >
> > > > This looks like the incorrect OWCs are being used. Do you have an
> Office
> > > XP
> > > > or better application installed on the box you're doing this from?
If
> > so,
> > > > try deleting the Office Web Components from Add/Remove programs and
> hit
> > > the
> > > > page again.
> > > >
> > > > --
> > > >
> > > > Gary Chefetz [MVP]
> > > > http://www.msprojectexperts.com
> > > > We wrote the book on Project Server
> > > >
> > > >
> > > > "Kasper Ovi" <ovi@kabelnettet.dk> wrote in message
> > > > news:zJRRb.2856$0m2.14@news.get2net.dk...
> > > > > Hi
> > > > >
> > > > > I've succesfully built the OLAP Cube and migrated it to the SQL
> > Server.
> > > > When
> > > > > I try to make a analyzer-view, I'm restricted in using the cube
> > > > dimensions.
> > > > > The fact is I'm only allowed to drop entries from the "Totals"
list
> to
> > > the
> > > > > diagram/tabeles and when I've done that, then it's not possible to
> > > remove
> > > > > that feature (eg. Actual cost) again.
> > > > >
> > > > > Maybe this picture helps? www.clk.dk/olap-issue.gif
> > > > >
> > > > > I've tried this one time before, but didn't find the solution back
> > then.
> > > > > Other installations have gone without problems, so I figure I
forget
> > > > > something or do something wrong!
> > > > >
> > > > > The user is member of the OLAP Admin group, and I've set up roles
> for
> > > > > Everyone to access all 3 cubes in the Analysis Database Role
> Manager.
> > > > > OfficeXP is also installed on the computer.
> > > > >
> > > > > Does anyone know what I do wrong?
> > > > >
> > > > > Thanks!
> > > > > Kasper
> > > > >
> > > > >
> > > >
> > > >
> > >
> > >
> >
> >
>
>
- Next message: PP: "Project 2003: Administrative Project"
- Previous message: Michael: "can't rename projects"
- Messages sorted by: [ date ] [ thread ]
Relevant Pages
|