Re: If Architects had to work like Programmers
From: Tom Pepper Willett (tompepper_at_mvps.org)
Date: 07/03/04
- Next message: Jason: "Required Field In Form"
- Previous message: Craig Schiller: "Re: If Architects had to work like Programmers"
- In reply to: Craig Schiller: "Re: If Architects had to work like Programmers"
- Next in thread: Jon Spivey: "Re: If Architects had to work like Programmers"
- Messages sorted by: [ date ] [ thread ]
Date: Fri, 2 Jul 2004 20:20:51 -0500
Clinton has a "reputation" in many newsgroups (not just Microsoft). Need I
say more?
Tom
"Craig Schiller" <cschiller1@earthlink.net> wrote in message
news:40E602DA.EA0A4D62@earthlink.net...
| So, Clinton... go to a non-Fascist country, already. I'm sure you'll enjoy
it a
| LOT better. Let us know which one you choose.
|
| LOL!
|
| clintonG wrote:
|
| > Kevin I have some bad news. I am a degreed architect and have
| > been working with 'programming' for a very very long time and
| > I hate to break it to you but architects 'do' have to work like
| > programmers with one exception:
| >
| > The United States has become a facist nation of filthy corrupt pigs.
| > An architect must become 'registered' by the state which controls
| > who can and who can not work. Working without permission from
| > the state can and does incur criminal prosecution. Achieving the
| > registration requires working for an employer who may or may
| > not choose to assign work to a person that is required for credit
| > by the state who issues the registration once a certain number of
| > credit hours are accumulated. Do you see the corruption here?
| > The law sets the requirements but there is no way to meet them
| > without indentured servitude and years of boot licking.
| >
| > All of the rationale for this is fraudulent as the fascist pigs claim
| > registration ensures that the public's safety, health, and welfare
| > is 'assured'. BULLSH!T Who has ever heard of an architect or
| > engineer who was sent to prison? It doesn't happen. There are
| > problems in the construction industry and some very corrupt inviduals
| > and firms for sure but everything gets settled in the 'civil' courts
| > anyway.
| >
| > There never has been and there never will be a registration that can
| > 'assure' a service provider is ethical or does not and will not make
| > mistakes. Thus, the entire aspect of 'registration' is by definition
fascism.
| >
| > On the other hand, software development is still totally merit based
| > and has no little neo-nazis -- yet -- that can use politics and corrupt
| > manipulation of the markets to prosecute people as criminals for
| > simply working. They are trying though.
| >
| > So trust me. Until you have to appear before a big fat c*nt who has
| > become a mayor and who has a bunch of equally assinine aldermen
| > who will grille you for weeks back and forth requiring new drawings
| > over and over and over simply to explain to their satisfaction which
| > side of the yard the f*cking bushes are going to be on you have no
| > appreciation of how sweet it can really be to continue to work in
| > one of the last merit based activities that thank God that still remains
| > untouched by the filthy neo-nazi pigs that are deconstructing our
| > nation and turning it into a neo-nazi communist gulag.
| >
| > --
| > <%= Clinton Gallagher
| > A/E/C Consulting, Web Design, e-Commerce Software Development
| > Wauwatosa, Milwaukee County, Wisconsin USA
| > NET csgallagher@ REMOVETHISTEXT metromilwaukee.com
| > URL http://www.metromilwaukee.com/clintongallagher/
| >
| > "Kevin Spencer" <kspencer@takempis.com> wrote in message
| > news:e23RRxEYEHA.3112@tk2msftngp13.phx.gbl...
| > > Dear Mr. Architect!
| > > Please design and build me a house. I am not quite sure of what I
need, so
| > > you should use your discretion. My house should have between two and
| > > forty-five bedrooms. Just make sure the plans are such that the
bedrooms can
| > > be easily added or deleted. When you bring the blueprints to me, I
will make
| > > the final decision of what I want. Also, bring me the cost breakdown
for
| > > each configuration so that I can arbitrarily pick one.
| > >
| > > Keep in mind that the house I ultimately choose must cost less than
the one
| > > I am currently living in. Make sure, however, that you correct all the
| > > deficiencies that exist in my current house (the floor of my kitchen
| > > vibrates when I walk across it, and the walls don't have nearly enough
| > > insulation in them).
| > >
| > > As you design, also keep in mind that I want to keep yearly
maintenance
| > > costs as low as possible. This should mean the incorporation of
extra-cost
| > > features like aluminum, vinyl, or composite siding. (If you choose not
to
| > > specify aluminum, be prepared to explain your decision in detail.)
| > >
| > > Please take care that modern design practices and the latest materials
are
| > > used in construction of the house, as I want it to be a showplace for
the
| > > most up-to-date ideas and methods. Be alerted, however, that kitchen
should
| > > be designed to accommodate, among other things, my 1952 Gibson
refrigerator.
| > >
| > > To insure that you are building the correct house for our entire
family,
| > > make certain that you contact each of our children, and also our
in-laws. My
| > > mother-in-law will have very strong feelings about how the house
should be
| > > designed, since she visits us at least once a year. Make sure that you
weigh
| > > all of these options carefully and come to the right decision. I,
however,
| > > retain the right to overrule any choices that you make.
| > >
| > > Please don't bother me with small details right now. Your job is to
develop
| > > the overall plans for the house: get the big picture. At this time,
for
| > > example, it is not appropriate to be choosing the color of the carpet.
| > > However, keep in mind that my wife likes blue.
| > >
| > > Also, do not worry at this time about acquiring the resources to build
the
| > > house itself. Your first priority is to develop detailed plans and
| > > specifications. Once I approve these plans, however, I would expect
the
| > > house to be under roof within 48 hours.
| > >
| > > While you are designing this house specifically for me, keep in mind
that
| > > sooner or later I will have to sell it to someone else. It therefore
should
| > > have appeal to a wide variety of potential buyers. Please make sure be
fore
| > > you finalize the plans that there is a consensus of the population in
my
| > > area that they like the features this house has.
| > >
| > > Please prepare a complete set of blueprints. It is not necessary at
this
| > > time to do the real design, since they will be used only for
construction
| > > bids. Be advised, however, that you will be held accountable for any
| > > increase of construction costs as a result of later design changes.
| > >
| > > You must be thrilled to be working on an interesting project as this!
To be
| > > able to use the latest techniques and materials and to be given such
freedom
| > > in your designs is something that can't happen very often. Contact me
as
| > > soon as possible with your complete ideas and plans.
| > >
| > > P.S.:
| > > My wife has just told me that she disagrees with many of the
instructions
| > > I've given you in this letter. As architect, it is your responsibility
to
| > > resolve these differences. I have tried in the past and have been
unable to
| > > accomplish this. If you can't handle this responsibility, I will have
to
| > > find another architect.
| > >
| > > P.P.S.:
| > > Perhaps what I need is not a house at all, but a travel trailer.
Please
| > > advise me as soon as possible if this is the case.
| > >
| > >
|
- Next message: Jason: "Required Field In Form"
- Previous message: Craig Schiller: "Re: If Architects had to work like Programmers"
- In reply to: Craig Schiller: "Re: If Architects had to work like Programmers"
- Next in thread: Jon Spivey: "Re: If Architects had to work like Programmers"
- Messages sorted by: [ date ] [ thread ]
Relevant Pages
|